AIRLINK 71.00 Decreased By ▼ -2.06 (-2.82%)
BOP 4.96 Decreased By ▼ -0.13 (-2.55%)
CNERGY 4.33 Decreased By ▼ -0.04 (-0.92%)
DFML 32.10 Decreased By ▼ -0.35 (-1.08%)
DGKC 77.75 Increased By ▲ 2.26 (2.99%)
FCCL 19.85 Increased By ▲ 0.33 (1.69%)
FFBL 35.39 Decreased By ▼ -0.76 (-2.1%)
FFL 9.17 Decreased By ▼ -0.05 (-0.54%)
GGL 9.94 Increased By ▲ 0.09 (0.91%)
HBL 113.50 Decreased By ▼ -3.20 (-2.74%)
HUBC 133.20 Increased By ▲ 0.51 (0.38%)
HUMNL 7.01 Decreased By ▼ -0.09 (-1.27%)
KEL 4.39 Decreased By ▼ -0.02 (-0.45%)
KOSM 4.35 Decreased By ▼ -0.05 (-1.14%)
MLCF 36.69 Increased By ▲ 0.49 (1.35%)
OGDC 135.00 Increased By ▲ 1.50 (1.12%)
PAEL 22.64 Increased By ▲ 0.04 (0.18%)
PIAA 25.22 Decreased By ▼ -0.79 (-3.04%)
PIBTL 6.51 Decreased By ▼ -0.04 (-0.61%)
PPL 118.45 Increased By ▲ 3.14 (2.72%)
PRL 26.53 Decreased By ▼ -0.10 (-0.38%)
PTC 13.88 Decreased By ▼ -0.22 (-1.56%)
SEARL 52.68 Decreased By ▼ -0.77 (-1.44%)
SNGP 68.00 Increased By ▲ 0.75 (1.12%)
SSGC 10.60 Decreased By ▼ -0.10 (-0.93%)
TELE 8.55 Increased By ▲ 0.13 (1.54%)
TPLP 10.95 Increased By ▲ 0.20 (1.86%)
TRG 62.51 Decreased By ▼ -1.36 (-2.13%)
UNITY 25.19 Increased By ▲ 0.07 (0.28%)
WTL 1.27 No Change ▼ 0.00 (0%)
BR100 7,458 Decreased By -3.3 (-0.04%)
BR30 24,214 Increased By 42.7 (0.18%)
KSE100 71,262 Increased By 159.6 (0.22%)
KSE30 23,455 Increased By 60.6 (0.26%)

imageISLAMABAD: Pakistan Railways (PR) has rehabilitated 66 bridges out of 159 and remaining would be rehabilitated upto June 2017.

The Railway administration desires to provide quick and safe journey to the travelling public within shortest possible time, official sources in the Ministry of Railways told APP.

"There are 13841 bridges including 532 major and 13309 minor bridges over the system. Most of the bridges were constructed well before partition, when Railway System was introduced in the subcontinent and have completed their useful life, the sources added.

They said that due to dedicated inspections and regular maintenance, bridges are generally in satisfactory condition for safe train operation.

In rehabilitation of flood damages, out of 69 bridges, 16 have been completed and remaining will be completed upto June 2017, the sources added.

They said the rehabilitation bridges will ensure safety standards, remove speed restrictions imposed on weak bridges, ensure effective maintenance in reducing the operational cost and meet the increased requirements of freight and passengers.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.