BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.14%)
KSE30 Decreased By (-0.13%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.17 Increased By ▲ 0.08 (1.57%)
BML 54.71 Decreased By ▼ -0.27 (-0.49%)
BOP 33.10 Increased By ▲ 0.12 (0.36%)
CNERGY 10.35 Increased By ▲ 0.25 (2.48%)
CSIL 5.13 No Change ▼ 0.00 (0%)
FCCL 52.25 Increased By ▲ 1.00 (1.95%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.86 Increased By ▲ 0.32 (5.78%)
LOTCHEM 27.17 Decreased By ▼ -1.95 (-6.7%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.70 Increased By ▲ 0.68 (1.24%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.78 Increased By ▲ 1.83 (0.59%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.25 Increased By ▲ 0.26 (0.63%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 213.83 Increased By ▲ 1.17 (0.55%)
PRL 54.15 Increased By ▲ 1.61 (3.06%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.16 Increased By ▲ 0.06 (0.24%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.41 Decreased By ▼ -0.33 (-1.52%)
TRG 59.98 Increased By ▲ 3.09 (5.43%)

imageMIRPUR: A high level meeting reviewed on Thursday the fast-track development of Kohala Hydro Power Project in Muzaffarabad district, it was officially declared.

Additional Chief Secretary Dr Tashfeen Khan presided over the meeting.

Highlighting the salient features of the mega project, experts brief the meeting that 1100 MW Kohala Hydro Power Project was the biggest in history being developed in private sector.

It is one of the three CPEC projects in AJK. The other two hydro power projects included 640 MW Kerote and 590 MW Mahl. All the three projects comprises the total strength of 2330 Mega Watts. Things are moving fast on these projects.

Famous Three Gorges Company of China with its three subsidiaries - Kohala Hydro Power Company, Kerote Hydro Power Company & Mahl Hydro Power Company - is developing these projects on fast track basis. This will allay the notions that private sector cannot develop mega hydels.

Expected to complete in a period of five years these projects are going to bring about a huge impact in country's energy-mix, by inducting cheap energy and bringing down energy price, besides bringing a big boost to AJK's economy in shape of Water Use Charges to be paid for 25 years and after 25 years two projects (Kohala and Mahl) will be handed over to AJK.

Experts termed the advent of all the three projects a major break through in AJK's Energy Sector.

A very conservative estimate tells us that on completion of these projects will bring 3-4,000 millions of annual income to AJK. And, after 25 years AJK will get dividends equivalent more that two Mangla Dams.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.