BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

imageISLAMABAD: Information Minister Pervaiz Rashid has said the government is striving to exploit the vast potential of renewable energy to meet the growing energy requirements of the country.

He was speaking at a function in connection with biomass energy project in Islamabad on Friday. The project will be completed in four years with the cooperation of United Nations Industrial Development Organization.

The Minister said several wind energy projects are in the pipeline and 2500 megawatt of electricity will be generated through this source by 2015.

Similarly‚ attention is also being given to exploit the potential of solar energy.

He said Pakistan is an agriculture country and has abundant resources of biomass‚ which could be utilized to significantly meet the requirements of industrial sector hit hard by the energy crisis.

Pervaiz Rashid pointed out the country was facing shortfall of five thousand megawatt when the present government assumed the power. He said the government retired circular debt of about four hundred and eighty billion rupees‚ which increased the power generation to record 17000 megawatt.

He said steps have also been taken to remove inefficiency in the transmission system and a campaign is also continuing against those involved in gas and power theft.

The Minister said the government is also taking long term measures to ensure energy security. These measures include coal based Gaddani power project which will add 6600 megawatt of electricity to the system. Work on Neelum Jhelum hydel power project has also been accelerated and this project is now expected to be completed by 2016.

Comments

Comments are closed for this article.