BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

PETRONASKUALA LUMPUR: Malaysia's state oil firm Petronas has approved plans to build a floating liquefied natural gas (LNG) plant offshore Malaysia and aims to bring it online in 2015, which, if it were successful, would make it the first such plant in the world.

Petronas' main competitor in the race to bring the first floating LNG plant online is oil major Royal Dutch Shell which approved its Prelude LNG floating plant last year and has said it intends to bring the plant online by 2017.

The floating LNG plant will allow Petronas to drill and ship gas from fields that were either too small or too remote to be profitable previously, CEO Shamsul Azhar Abbas said at a gas industry gathering in Kuala Lumpur on Monday.

"This is an example where advancement of technology has made it economically feasible to monetise stranded gas in small and scattered conventional fields," Shamsul said of the project.

Petronas is facing diminishing oil and gas reserves in Malaysia and plans to spend 300 million ringgit ($93.79 million) over the next five years to step up its deep-water exploration activities as well as re-exploring marginal fields.

In 2011, Malaysia was the world's second largest exporter of LNG, according to Petronas and the world's 15th largest gas producer. But declining reserves in Malaysia are forcing the country to import the fuel as well.

Malaysia's first LNG import terminal in Melaka, Malaysia, is due to start up in July 2012.

"The intent is to prepare for the impending shortfall of supply in peninsular Malaysia. We are also assessing the feasibility of constructing a second LNG re-gasification terminal," Shamsul said.

The second terminal would be in southern Johor, and a third terminal in Lahad Datu in east Malaysia is set to be commissioned in 2015, he added.

Copyright Reuters, 2012

Comments

Comments are closed for this article.