AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,599 Increased By 139.8 (0.55%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)
Pakistan

Multiple Toll Plazas on Karachi-Hyderabad M-9 to be replaced with one: Murad

He said the previous government in haste had converted the old National Highway into new Karachi-Hyderabad Motorway
Published March 9, 2020
  • He said the previous government in haste had converted the old National Highway into new Karachi-Hyderabad Motorway (M-9) without planning.
  • He said however widening and improvement of 130 KM road is under consideration through Korean Exim Bank financing.
  • He informed the house that Gilgit to Chitral via Shandur road measuring 370 KM is declared as a CPEC alternative route.

ISLAMABAD: Federal Minister for Communication Murad Saeed on Monday assured the parliament that multiple toll plazas on Karachi-Hyderabad Motorway (M-9) will be replaced with one plaza soon.

He said the previous government in haste had converted the old National Highway into new Karachi-Hyderabad Motorway (M-9) without planning.

The M-9 project was executed on Built, Operate and Transfer (BOT) basis according to which the company awarded the contract built a new toll plaza for toll collection for 20 years, the minister said.

He said his team was trying to improve the situation at M-9 and preparing a comprehensive report highlighting the flaws in previous agreement and solution to the problems which would be presented in the parliament as well.

He said M-9 is jammed due to traffic load because of the axle load and shortage of lanes however a correspondence was started with the Sindh Government to increase the lanes in the Motorway.

Earlier responding to another question that whether the road from Chakdra to Chitral was made one way, the minister said that N-45 is a single carriageway and no proposal for dualization of this road is under consideration as yet.

He said however widening and improvement of 130 KM road is under consideration through Korean Exim Bank financing.

He informed the house that Gilgit to Chitral via Shandur road measuring 370 KM is declared as a CPEC alternative route.

Comments

Comments are closed.