AIRLINK 74.85 Increased By ▲ 0.56 (0.75%)
BOP 4.94 Decreased By ▼ -0.01 (-0.2%)
CNERGY 4.38 Increased By ▲ 0.01 (0.23%)
DFML 39.00 Increased By ▲ 0.20 (0.52%)
DGKC 85.60 Increased By ▲ 0.78 (0.92%)
FCCL 21.30 Increased By ▲ 0.09 (0.42%)
FFBL 34.15 Increased By ▲ 0.03 (0.09%)
FFL 9.66 Decreased By ▼ -0.04 (-0.41%)
GGL 10.41 Decreased By ▼ -0.01 (-0.1%)
HBL 113.50 Increased By ▲ 0.50 (0.44%)
HUBC 137.00 Increased By ▲ 0.80 (0.59%)
HUMNL 11.89 Decreased By ▼ -0.01 (-0.08%)
KEL 4.77 Increased By ▲ 0.06 (1.27%)
KOSM 4.42 Decreased By ▼ -0.02 (-0.45%)
MLCF 37.85 Increased By ▲ 0.20 (0.53%)
OGDC 138.26 Increased By ▲ 2.06 (1.51%)
PAEL 25.26 Increased By ▲ 0.16 (0.64%)
PIAA 20.60 Increased By ▲ 1.36 (7.07%)
PIBTL 6.64 Decreased By ▼ -0.07 (-1.04%)
PPL 122.60 Increased By ▲ 0.50 (0.41%)
PRL 26.77 Increased By ▲ 0.12 (0.45%)
PTC 13.95 Increased By ▲ 0.02 (0.14%)
SEARL 57.90 Increased By ▲ 0.68 (1.19%)
SNGP 67.32 Decreased By ▼ -0.28 (-0.41%)
SSGC 10.32 Increased By ▲ 0.07 (0.68%)
TELE 8.42 Increased By ▲ 0.02 (0.24%)
TPLP 11.16 Increased By ▲ 0.03 (0.27%)
TRG 63.49 Increased By ▲ 0.68 (1.08%)
UNITY 26.60 Increased By ▲ 0.10 (0.38%)
WTL 1.50 Increased By ▲ 0.15 (11.11%)
BR100 7,845 Increased By 34.5 (0.44%)
BR30 25,340 Increased By 190.2 (0.76%)
KSE100 75,148 Increased By 191.5 (0.26%)
KSE30 24,149 Increased By 65.8 (0.27%)

The government has allocated Rs 418 billion for power sector for CDWP-approved, unapproved and under-process projects under the Public Sector Development Programme (PSDP) 2019-20. The key project included in the PSDP is 500 kV HVDC transmission system between Tajikistan and Pakistan for Central Asia-South Asia Transmission Interconnection (CAPA-1000). For this long awaited project, an amount of Rs 7.877 billion has been earmarked in the PSDP.
Most of the approved projects are related to grid stations and 220 kV and 500 kV transmission lines in different cities aimed at improving transmission system and bringing down transmission losses.

Copyright Business Recorder, 2019

Comments

Comments are closed.