AIRLINK 74.75 Increased By ▲ 0.46 (0.62%)
BOP 4.93 Decreased By ▼ -0.02 (-0.4%)
CNERGY 4.35 Decreased By ▼ -0.02 (-0.46%)
DFML 39.68 Increased By ▲ 0.88 (2.27%)
DGKC 85.78 Increased By ▲ 0.96 (1.13%)
FCCL 21.20 Decreased By ▼ -0.01 (-0.05%)
FFBL 34.15 Increased By ▲ 0.03 (0.09%)
FFL 9.65 Decreased By ▼ -0.05 (-0.52%)
GGL 10.45 Increased By ▲ 0.03 (0.29%)
HBL 113.73 Increased By ▲ 0.73 (0.65%)
HUBC 137.06 Increased By ▲ 0.86 (0.63%)
HUMNL 11.51 Decreased By ▼ -0.39 (-3.28%)
KEL 4.76 Increased By ▲ 0.05 (1.06%)
KOSM 4.49 Increased By ▲ 0.05 (1.13%)
MLCF 37.70 Increased By ▲ 0.05 (0.13%)
OGDC 139.40 Increased By ▲ 3.20 (2.35%)
PAEL 25.49 Increased By ▲ 0.39 (1.55%)
PIAA 20.68 Increased By ▲ 1.44 (7.48%)
PIBTL 6.63 Decreased By ▼ -0.08 (-1.19%)
PPL 122.65 Increased By ▲ 0.55 (0.45%)
PRL 26.53 Decreased By ▼ -0.12 (-0.45%)
PTC 13.96 Increased By ▲ 0.03 (0.22%)
SEARL 58.16 Increased By ▲ 0.94 (1.64%)
SNGP 67.11 Decreased By ▼ -0.49 (-0.72%)
SSGC 10.30 Increased By ▲ 0.05 (0.49%)
TELE 8.40 No Change ▼ 0.00 (0%)
TPLP 11.15 Increased By ▲ 0.02 (0.18%)
TRG 63.50 Increased By ▲ 0.69 (1.1%)
UNITY 26.63 Increased By ▲ 0.13 (0.49%)
WTL 1.45 Increased By ▲ 0.10 (7.41%)
BR100 7,833 Increased By 23.2 (0.3%)
BR30 25,349 Increased By 199 (0.79%)
KSE100 75,115 Increased By 158.2 (0.21%)
KSE30 24,154 Increased By 70.4 (0.29%)

The government has allocated Rs 418 billion for power sector for CDWP-approved, unapproved and under-process projects under the Public Sector Development Programme (PSDP) 2019-20. The key project included in the PSDP is 500 kV HVDC transmission system between Tajikistan and Pakistan for Central Asia-South Asia Transmission Interconnection (CAPA-1000). For this long awaited project, an amount of Rs 7.877 billion has been earmarked in the PSDP.
Most of the approved projects are related to grid stations and 220 kV and 500 kV transmission lines in different cities aimed at improving transmission system and bringing down transmission losses.

Copyright Business Recorder, 2019

Comments

Comments are closed.