BR100 Increased By (1.77%)
BR30 Increased By (1.96%)
KSE100 Increased By (1.59%)
KSE30 Increased By (1.65%)
BECO 5.62 Increased By ▲ 0.04 (0.72%)
BML 59.51 Decreased By ▼ -1.71 (-2.79%)
BOP 34.61 Increased By ▲ 0.93 (2.76%)
CNERGY 8.08 No Change ▼ 0.00 (0%)
DCL 12.05 Increased By ▲ 0.41 (3.52%)
FCCL 54.40 Increased By ▲ 2.26 (4.33%)
FCSC 5.52 Decreased By ▼ -0.11 (-1.95%)
FFL 18.05 Increased By ▲ 0.04 (0.22%)
FNEL 1.33 Decreased By ▼ -0.02 (-1.48%)
HUMNL 11.07 Increased By ▲ 0.03 (0.27%)
KEL 8.05 Increased By ▲ 0.21 (2.68%)
KOSM 5.88 Increased By ▲ 0.15 (2.62%)
MLCF 90.52 Increased By ▲ 4.01 (4.64%)
NBP 190.17 Increased By ▲ 5.87 (3.19%)
PACE 11.53 Decreased By ▼ -0.12 (-1.03%)
PAEL 41.07 Increased By ▲ 1.11 (2.78%)
PIAHCLA 25.84 Increased By ▲ 0.17 (0.66%)
PIBTL 17.51 Increased By ▲ 0.24 (1.39%)
PPL 225.84 Increased By ▲ 3.17 (1.42%)
PRL 34.63 Increased By ▲ 0.17 (0.49%)
PTC 64.62 Increased By ▲ 0.88 (1.38%)
SEARL 91.38 Increased By ▲ 0.92 (1.02%)
SSGC 26.97 Increased By ▲ 0.30 (1.12%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 69.16 Increased By ▲ 0.69 (1.01%)
TPLP 10.90 Decreased By ▼ -0.30 (-2.68%)
TREET 24.64 Decreased By ▼ -0.06 (-0.24%)
TRG 69.78 Decreased By ▼ -0.81 (-1.15%)
WAVES 11.16 Increased By ▲ 0.05 (0.45%)
WTL 1.27 No Change ▼ 0.00 (0%)

The Lahore Chamber of Commerce and Industry has said that water scarcity in Sindh and other parts of the country is due to our inability to build Kalabagh Dam. LCCI President Malik Tahir Javaid said that not only Sindh but the entire country is facing the issue of water scarcity. Situation in Sindh is severe but it is not due to Federation or Punjab. It is because of those elements which are against the Kalabagh Dam, he said.
This notion is totally wrong that Kalabagh Dam will turn Sindh into an arid zone. Actually delay in construction of Kalabagh Dam is the only reason of water shortage in Sindh. He said water supply to Sindh was averaged 36.6 million acre feet annually before construction of Mangla and Terbala dams. This supply was enhanced to 40.30 million acre feet after building of these dams. Kalabagh Dam will also supply over 4 million acre feet additional water to Sindh, he added.
The Lahore Chamber had already feared that water crisis would hit the agriculture sector of Punjab and Sindh as country has no big water reservoirs while water storage capacity in Terbela and Mangla dams has considerably gone down. Therefore, Kalabagh Dam is a must for the country, he said.
"It would be better if the anti-Kalabagh Dam elements play role for early construction of this mega project instead of fueling the provincial conflict otherwise our future generations would suffer," he said. It is inevitable for progress and prosperity of the country as it will produce power at an average cost of Rs 2/kwh. This cheap power will annually displace costly power worth approximately Rs 300 billion with consequential savings of costly oil imports, he added.
He said there was no threat to Nowshehra city as it is 150 feet above the water level. The dam can irrigate 800,000 acres of land that is located 100-150 feet above the Indus river level in the province. He said this land could only be brought under cultivation if the river level is raised that is only possible if Kalabagh Dam is built. He said the other alternative is to pump the water which is very costly, he added.

Copyright Business Recorder, 2018

Comments

Comments are closed for this article.