BR100 Increased By (0.99%)
BR30 Increased By (1.17%)
KSE100 Increased By (0.81%)
KSE30 Increased By (0.77%)
BECO 5.68 Increased By ▲ 0.09 (1.61%)
BML 64.84 Increased By ▲ 3.81 (6.24%)
BOP 33.60 Increased By ▲ 0.35 (1.05%)
CNERGY 8.24 Increased By ▲ 0.19 (2.36%)
DCL 11.35 Increased By ▲ 0.05 (0.44%)
FCCL 52.91 Decreased By ▼ -0.02 (-0.04%)
FCSC 5.52 Increased By ▲ 0.18 (3.37%)
FFL 17.80 Increased By ▲ 0.19 (1.08%)
FNEL 1.30 Decreased By ▼ -0.01 (-0.76%)
HUMNL 11.24 Increased By ▲ 0.12 (1.08%)
KEL 7.97 Increased By ▲ 0.08 (1.01%)
KOSM 5.44 Increased By ▲ 0.11 (2.06%)
MLCF 86.01 Increased By ▲ 0.66 (0.77%)
NBP 185.00 Increased By ▲ 3.71 (2.05%)
PACE 12.02 Increased By ▲ 0.49 (4.25%)
PAEL 40.21 Increased By ▲ 0.80 (2.03%)
PIAHCLA 25.73 Increased By ▲ 0.10 (0.39%)
PIBTL 17.32 Increased By ▲ 0.17 (0.99%)
PPL 225.30 Increased By ▲ 0.48 (0.21%)
PRL 34.38 Increased By ▲ 0.20 (0.59%)
PTC 65.46 Increased By ▲ 0.38 (0.58%)
SEARL 90.51 Increased By ▲ 0.91 (1.02%)
SSGC 26.76 Increased By ▲ 0.45 (1.71%)
TELE 8.96 Increased By ▲ 0.58 (6.92%)
THCCL 69.44 Increased By ▲ 0.10 (0.14%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.55 Increased By ▲ 0.35 (1.45%)
TRG 71.67 Increased By ▲ 2.13 (3.06%)
WAVES 11.45 Increased By ▲ 0.42 (3.81%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

Mayor Karachi Waseem Akhtar said construction work of Golimar Underpass will be completed by the 15th of this month after which surrounding areas of Golimar Underpass would get rid of traffic gridlock. "I have this desire that this underpass was named after a renowned personality."
He expressed these views while talking to media representatives after inspecting the development works of Golimar Underpass on Saturday. He was accompanied by the DMC Central Chairman Rehan Hashmi, Municipal Commissioner Dr Badar Jameel, Sr Director MS Masood Alam, DG Technical Services Shahab Anwer and others. Mayor Karachi said this Rs 450million worth underpass has a total length of 375 meter and 8 meter width and its construction was delayed for some time. He also directed that good standard and durability should be ensured in the construction of this underpass and during development works around this project. He said the installation of pedestrian bridge will also be started just after completion of this project.

Comments

Comments are closed for this article.