AIRLINK 74.80 Increased By ▲ 0.51 (0.69%)
BOP 4.95 No Change ▼ 0.00 (0%)
CNERGY 4.38 Increased By ▲ 0.01 (0.23%)
DFML 39.11 Increased By ▲ 0.31 (0.8%)
DGKC 85.65 Increased By ▲ 0.83 (0.98%)
FCCL 21.35 Increased By ▲ 0.14 (0.66%)
FFBL 34.01 Decreased By ▼ -0.11 (-0.32%)
FFL 9.75 Increased By ▲ 0.05 (0.52%)
GGL 10.48 Increased By ▲ 0.06 (0.58%)
HBL 113.65 Increased By ▲ 0.65 (0.58%)
HUBC 137.20 Increased By ▲ 1.00 (0.73%)
HUMNL 11.90 No Change ▼ 0.00 (0%)
KEL 4.74 Increased By ▲ 0.03 (0.64%)
KOSM 4.45 Increased By ▲ 0.01 (0.23%)
MLCF 37.90 Increased By ▲ 0.25 (0.66%)
OGDC 138.53 Increased By ▲ 2.33 (1.71%)
PAEL 25.30 Increased By ▲ 0.20 (0.8%)
PIAA 20.58 Increased By ▲ 1.34 (6.96%)
PIBTL 6.65 Decreased By ▼ -0.06 (-0.89%)
PPL 122.67 Increased By ▲ 0.57 (0.47%)
PRL 26.83 Increased By ▲ 0.18 (0.68%)
PTC 13.94 Increased By ▲ 0.01 (0.07%)
SEARL 58.05 Increased By ▲ 0.83 (1.45%)
SNGP 67.50 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.32 Increased By ▲ 0.07 (0.68%)
TELE 8.42 Increased By ▲ 0.02 (0.24%)
TPLP 11.19 Increased By ▲ 0.06 (0.54%)
TRG 63.44 Increased By ▲ 0.63 (1%)
UNITY 26.60 Increased By ▲ 0.10 (0.38%)
WTL 1.48 Increased By ▲ 0.13 (9.63%)
BR100 7,846 Increased By 35.3 (0.45%)
BR30 25,360 Increased By 210.3 (0.84%)
KSE100 75,192 Increased By 235.2 (0.31%)
KSE30 24,172 Increased By 89 (0.37%)

Khyber Pakhtunkhwa Senior Minister for Local Government & Rural Development LG&RD) Inayatullah Khan called on PESCO PESCO Fazil Hasan at WAPDA House Peshawar on Monday and apprised him of the concerns of the people in respect of unscheduled and prolong load shedding in Malakand Division especially in Dir District.
Inayatullah made it clear to PESCO Chief that like Hazara Division, the consumers in Malakand Division also regularly pay electricity bills and no cases of power theft are reported there but load shedding of long duration and voltage fluctuations have become routine matter that must be checked properly, he added. The Senior Minister asked for drastic decrease in load shedding in Malakand Division. He also directed to complete all ongoing electricity distribution schemes in-time as well as expediting work on Chakdara Grid Station.
PESCO Chief assured the Senior Minister that load shedding in Malakand would be reduced to minimal level. Similarly, he assured for expediting work on Chakdara Grid Station and all other power supply schemes in the area to provide prompt relief to the consumers.

Copyright Business Recorder, 2015

Comments

Comments are closed.