BR100 Increased By (0.44%)
BR30 Increased By (1.39%)
KSE100 Increased By (0.62%)
KSE30 Increased By (0.61%)
BECO 5.49 No Change ▼ 0.00 (0%)
BML 56.00 Decreased By ▼ -0.76 (-1.34%)
BOP 35.41 Increased By ▲ 0.29 (0.83%)
CNERGY 8.20 Increased By ▲ 0.05 (0.61%)
DCL 11.55 Increased By ▲ 0.04 (0.35%)
FCCL 58.15 Increased By ▲ 1.40 (2.47%)
FCSC 5.15 No Change ▼ 0.00 (0%)
FFL 17.90 Increased By ▲ 0.02 (0.11%)
FNEL 1.25 No Change ▼ 0.00 (0%)
HUMNL 11.10 Decreased By ▼ -0.02 (-0.18%)
KEL 8.56 Increased By ▲ 0.14 (1.66%)
KOSM 6.75 Increased By ▲ 0.17 (2.58%)
MLCF 105.65 Increased By ▲ 2.35 (2.27%)
NBP 202.10 Increased By ▲ 1.92 (0.96%)
PACE 11.28 Decreased By ▼ -0.01 (-0.09%)
PAEL 44.42 Increased By ▲ 0.95 (2.19%)
PIAHCLA 28.66 Increased By ▲ 1.17 (4.26%)
PIBTL 18.75 Increased By ▲ 1.05 (5.93%)
PPL 248.10 Increased By ▲ 3.78 (1.55%)
PRL 35.35 Decreased By ▼ -0.08 (-0.23%)
PTC 66.15 Increased By ▲ 0.80 (1.22%)
SEARL 94.95 Increased By ▲ 1.63 (1.75%)
SSGC 32.04 Decreased By ▼ -0.90 (-2.73%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 66.65 Decreased By ▼ -0.07 (-0.1%)
TPLP 10.76 Decreased By ▼ -0.07 (-0.65%)
TREET 25.22 Increased By ▲ 0.10 (0.4%)
TRG 64.21 Decreased By ▼ -0.69 (-1.06%)
WAVES 10.85 Decreased By ▼ -0.08 (-0.73%)
WTL 1.27 Increased By ▲ 0.02 (1.6%)

LAHORE: The technical issues on the Lahore-Okara railway track have been resolved and the computer-based interlocking system is now fully operational, allowing trains to run at their approved speeds.

This was disclosed during the Divisional Superintendent (DS) Special Inspection team of the Lahore-Okara section on Friday, led by DS Railways Muhammad Hanif Gul.

Officials confirmed that due to enhanced monitoring by the Railway Lahore Division and the efforts of railway workers, the technical challenges have been addressed. During the inspection, which included senior divisional officers, the civil engineering team assured that the upgrade allows passenger trains to operate efficiently at approved speeds.

Divisional Engineer Civil Haji Muhammad, speaking to journalists, said, "The technical issues affecting the Lahore-Okara section have been resolved. With the interlocking system in place, we are ensuring a safe and smooth journey for all passengers."

The inspection team, which included key officials - Divisional Commercial Officer Ghulam Fareed Asad, DMO Saima Mumtaz, DTO Arwa Khan, DME Muhammad Zohaib, and others, conducted a comprehensive review of the railway infrastructure. They inspected track alignment, signaling systems, railway crossings, and station facilities to ensure compliance with safety and operational standards. Railway workers were questioned on safety protocols and commended for their hard work, with gagmen receiving cash rewards for their exceptional service.

In addition, DS Muhammad Hanif Gul directed improvements to the entrance of Okara City Station and coordinated with DC Okara, Farah Butt, to enhance the station’s infrastructure further.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.