BR100 Increased By (1.91%)
BR30 Increased By (2.79%)
KSE100 Increased By (1.56%)
KSE30 Increased By (1.67%)
AGHA 6.55 Increased By ▲ 0.14 (2.18%)
BECO 4.32 Increased By ▲ 0.03 (0.7%)
BML 55.46 Increased By ▲ 1.10 (2.02%)
BOP 29.72 Increased By ▲ 0.83 (2.87%)
CNERGY 12.93 Increased By ▲ 0.72 (5.9%)
CSIL 5.15 Increased By ▲ 0.12 (2.39%)
FCCL 51.85 Increased By ▲ 1.85 (3.7%)
FFL 13.99 Increased By ▲ 0.17 (1.23%)
FNEL 1.19 Increased By ▲ 0.02 (1.71%)
KEL 5.59 Decreased By ▼ -0.03 (-0.53%)
KOSM 5.53 Increased By ▲ 0.17 (3.17%)
LOTCHEM 25.72 Increased By ▲ 0.42 (1.66%)
MLCF 91.29 Increased By ▲ 3.05 (3.46%)
NBP 161.74 Increased By ▲ 4.79 (3.05%)
NCPL 52.46 Increased By ▲ 1.29 (2.52%)
NPL 55.05 Increased By ▲ 0.89 (1.64%)
OGDC 317.05 Increased By ▲ 6.71 (2.16%)
PACE 9.59 Increased By ▲ 0.40 (4.35%)
PAEL 33.98 Increased By ▲ 0.97 (2.94%)
PIBTL 13.57 Increased By ▲ 0.38 (2.88%)
PPL 221.12 Increased By ▲ 4.64 (2.14%)
PRL 94.38 Increased By ▲ 6.96 (7.96%)
PTC 58.06 Increased By ▲ 1.51 (2.67%)
SSGC 23.07 Increased By ▲ 0.59 (2.62%)
TBL 8.71 Increased By ▲ 0.05 (0.58%)
TELE 7.24 Increased By ▲ 0.27 (3.87%)
TPL 20.72 Increased By ▲ 0.05 (0.24%)
TPLP 11.74 Increased By ▲ 0.14 (1.21%)
TREET 20.97 Increased By ▲ 0.59 (2.89%)
TRG 55.34 Increased By ▲ 3.89 (7.56%)

ISLAMABAD: Prime Minister Shehbaz Sharif has sought a plan on a priority basis for improvement in the transmission system of the power sector and distribution companies, besides instructing to expedite the process for privatisation and outsourcing of distribution companies.

While presiding over the second round of a meeting to review the measures regarding the power sector on Thursday, the prime minister instructed that a plan to bring about improvement of the transmission system and distribution companies should be prepared and presented by next week.

He said that the help of the private sector’s experts should be taken for the improvement of the management of the distribution companies as reforms in the power sector would help reduce the circular debt.

Conversion of power plants o Thar coal: PM urges Shanghai Group to invest

The premier also directed to complete within the specified time all the major projects aimed at improvement in the power transmission system.

The meeting was presented measures and recommendations with respect to new power transmission projects, reorganisation of the National Transmission and Dispatch Company (NTDC) and prevention of power theft.

The meeting was told that Matiari Rahim Yar Khan Transmission Line and Ghazi Brotha Faisalabad Line will be constructed to transmit electricity from the south of the country.

The meeting was further informed that a restructuring plan of the NTDC has been drawn up for the reform of the electricity transmission system and to reduce the circular debt.

Federal ministers Khawaja Asif, Ishaq Dar, Ahad Khan Cheema, Mohsin Naqvi, Attaullah Tarar, Sardar Awais Leghari, Musadik Malik, Aleem Khan, former minister for electricity Muhammad Ali, Deputy Chairman Planning Jahanzeb Khan, were present in the meeting. Relevant senior officials also participated in the meeting.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.