AIRLINK 60.40 Increased By ▲ 0.20 (0.33%)
BOP 6.30 Increased By ▲ 0.05 (0.8%)
CNERGY 4.38 Increased By ▲ 0.32 (7.88%)
DFML 16.05 Increased By ▲ 0.30 (1.9%)
DGKC 69.80 Increased By ▲ 1.55 (2.27%)
FCCL 18.13 Increased By ▲ 0.51 (2.89%)
FFBL 26.00 Increased By ▲ 0.50 (1.96%)
FFL 9.19 Increased By ▲ 0.10 (1.1%)
GGL 10.05 Increased By ▲ 0.20 (2.03%)
HBL 116.60 Increased By ▲ 1.60 (1.39%)
HUBC 112.09 Increased By ▲ 0.09 (0.08%)
HUMNL 6.71 Increased By ▲ 0.16 (2.44%)
KEL 4.63 Increased By ▲ 0.10 (2.21%)
KOSM 4.70 Increased By ▲ 0.18 (3.98%)
MLCF 38.55 Increased By ▲ 0.65 (1.72%)
OGDC 123.33 Increased By ▲ 2.78 (2.31%)
PAEL 22.14 Increased By ▲ 0.39 (1.79%)
PIAA 11.01 Increased By ▲ 0.11 (1.01%)
PIBTL 6.16 Increased By ▲ 0.14 (2.33%)
PPL 108.70 Increased By ▲ 1.90 (1.78%)
PRL 27.90 Increased By ▲ 0.55 (2.01%)
PTC 11.10 Increased By ▲ 0.55 (5.21%)
SEARL 52.30 Increased By ▲ 0.30 (0.58%)
SNGP 67.80 Increased By ▲ 0.90 (1.35%)
SSGC 11.75 Increased By ▲ 0.22 (1.91%)
TELE 8.07 Increased By ▲ 1.02 (14.47%)
TPLP 11.75 Increased By ▲ 0.19 (1.64%)
TRG 75.81 Decreased By ▼ -4.94 (-6.12%)
UNITY 22.75 Increased By ▲ 1.60 (7.57%)
WTL 1.30 Increased By ▲ 0.03 (2.36%)
BR100 6,554 Increased By 69.3 (1.07%)
BR30 22,371 Increased By 272.5 (1.23%)
KSE100 63,742 Increased By 523.3 (0.83%)
KSE30 21,503 Increased By 196.8 (0.92%)

LAHORE: The caretaker Chief Minister Punjab Mohsin Naqvi conducted an inspection of the ongoing development works at the under-construction “Band Road Controlled Access Corridor Project,” here on Monday.

The CM specifically observed the construction progress of walls around the corridor in Package One. Providing directives to the contractor of Package 2, he emphasized the need to expedite the corridor walls’ construction and urged for the timely completion of the project.

The CM highlighted that the project’s completion would facilitate immediate motorway access from any area in Lahore, ultimately saving significant time and fuel costs.

The Controlled Access Corridor spans from Niazi Chowk to Sagian Interchange in Package One and Sigian Interchange to Babu Sabu Interchange in Package Two.

Copyright Business Recorder, 2023

Comments

Comments are closed.