BR100 Decreased By (-0.64%)
BR30 Decreased By (-1.08%)
KSE100 Decreased By (-0.46%)
KSE30 Decreased By (-0.39%)
AGHA 6.70 Increased By ▲ 0.02 (0.3%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 56.25 Decreased By ▼ -1.07 (-1.87%)
BOP 30.24 Decreased By ▼ -0.11 (-0.36%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.34 Decreased By ▼ -0.07 (-1.29%)
FCCL 52.28 Decreased By ▼ -0.51 (-0.97%)
FFL 14.59 Decreased By ▼ -0.13 (-0.88%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.13 Increased By ▲ 0.04 (0.66%)
KOSM 6.05 Increased By ▲ 0.32 (5.58%)
LOTCHEM 26.31 Decreased By ▼ -0.15 (-0.57%)
MLCF 91.60 Decreased By ▼ -1.56 (-1.67%)
NBP 164.25 Decreased By ▼ -0.41 (-0.25%)
NCPL 53.78 Decreased By ▼ -1.88 (-3.38%)
NPL 58.89 Decreased By ▼ -2.27 (-3.71%)
OGDC 315.00 Decreased By ▼ -1.73 (-0.55%)
PACE 9.86 Decreased By ▼ -0.01 (-0.1%)
PAEL 35.18 Decreased By ▼ -0.45 (-1.26%)
PIBTL 14.67 Decreased By ▼ -0.01 (-0.07%)
PPL 222.90 Decreased By ▼ -4.01 (-1.77%)
PRL 91.35 Decreased By ▼ -1.67 (-1.8%)
PTC 59.25 Decreased By ▼ -1.01 (-1.68%)
SSGC 23.35 Decreased By ▼ -0.46 (-1.93%)
TBL 8.68 Decreased By ▼ -0.07 (-0.8%)
TELE 7.70 Decreased By ▼ -0.10 (-1.28%)
TPL 22.11 Decreased By ▼ -0.24 (-1.07%)
TPLP 12.69 Decreased By ▼ -0.28 (-2.16%)
TREET 21.95 Decreased By ▼ -0.21 (-0.95%)
TRG 56.20 Decreased By ▼ -0.36 (-0.64%)
By

KARACHI: The main causeway connecting Korangi to the main Karachi city has been closed completely on Wednesday for traffic after the Malir River swelled due to heavy rains.

Both tracks of the Korangi crossing road are feared to be flooded by the Malir River, the rescue sources said.

There was witnessed worst traffic jam on Jam Sadiq Bridge due to the closure of the road. Many vehicles were stuck in the traffic jam. The pressure of traffic grew on the road to Korangi due to the traffic jam.

Comments

Comments are closed for this article.

Maqbool Jul 27, 2023 04:01pm
Is the illegal road still being constructed there to connect dha Phase 8 to Phase 9, so reducing the river width and causing flooding ?
0