AIRLINK 80.00 Increased By ▲ 1.61 (2.05%)
BOP 5.29 Decreased By ▼ -0.05 (-0.94%)
CNERGY 4.40 Increased By ▲ 0.07 (1.62%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 77.90 Decreased By ▼ -0.61 (-0.78%)
FCCL 20.48 Decreased By ▼ -0.10 (-0.49%)
FFBL 32.28 Decreased By ▼ -0.02 (-0.06%)
FFL 10.33 Increased By ▲ 0.11 (1.08%)
GGL 10.38 Increased By ▲ 0.09 (0.87%)
HBL 117.99 Decreased By ▼ -0.51 (-0.43%)
HUBC 135.50 Increased By ▲ 0.40 (0.3%)
HUMNL 6.85 Decreased By ▼ -0.02 (-0.29%)
KEL 4.59 Increased By ▲ 0.42 (10.07%)
KOSM 4.82 Increased By ▲ 0.09 (1.9%)
MLCF 38.43 Decreased By ▼ -0.24 (-0.62%)
OGDC 134.25 Decreased By ▼ -0.60 (-0.44%)
PAEL 23.85 Increased By ▲ 0.45 (1.92%)
PIAA 26.90 Increased By ▲ 0.26 (0.98%)
PIBTL 7.01 Decreased By ▼ -0.01 (-0.14%)
PPL 113.37 Decreased By ▼ -0.08 (-0.07%)
PRL 27.92 Increased By ▲ 0.19 (0.69%)
PTC 14.86 Increased By ▲ 0.26 (1.78%)
SEARL 58.05 Increased By ▲ 1.55 (2.74%)
SNGP 67.45 Increased By ▲ 1.15 (1.73%)
SSGC 11.18 Increased By ▲ 0.24 (2.19%)
TELE 9.35 Increased By ▲ 0.20 (2.19%)
TPLP 11.75 Increased By ▲ 0.08 (0.69%)
TRG 73.40 Increased By ▲ 1.97 (2.76%)
UNITY 24.89 Increased By ▲ 0.38 (1.55%)
WTL 1.41 Increased By ▲ 0.08 (6.02%)
BR100 7,523 Increased By 30.3 (0.4%)
BR30 24,718 Increased By 160.1 (0.65%)
KSE100 72,336 Increased By 284.5 (0.39%)
KSE30 23,831 Increased By 22.7 (0.1%)

KARACHI: Administrator Karachi Barrister Murtaza Wahab on Friday directed the Director General Engineering Department of Karachi Metropolitan Corporation (KMC) to complete the under-construction roads within the stipulated 45 days in any case.

Officials said that the Engineering Department is carrying out construction and lining of more than 20 roads in different areas of the city under special grant of Rs.1 billion from the Sindh government.

The roads of District Central where construction work has started immediately included Gharibabad to Usman Memorial Hospital, Madina Masjid Food Street, Ziauddin Hospital Chowrangi to Mujahid Colony, Sir Syed Girls College to Lasbela Chowrangi, Bada Maidan to Khilifat Chowk and M. Mateen Food Road. These roads are being constructed at a cost of Rs. 50 million each.

In East District University Road, Sindhi Muslim Society Chowrangi and Commercial Area, Link Road Tipu Sultan, Mubarak Shaheed Road is being constructed.

In South District, construction work is in progress on Shahrah e Attar and adjacent areas, Shahrah e Iran, Shahrah e Liaquat, MA Jinnah Road at a cost of Rs. 50 million each.

Similarly in Malir district, Khalid Bin Waleed Road is under construction from Bhens Colony to Mehran Highway. Hyedri Chowk Road, Ammar Yasir Phase One and internal streets, and the road from Qadeer Chowk to Nafees Cinema are also under construction.

In West and Keamari Districts, Jackson Market Road and adjacent areas roads and Site Flyover to Lyari Expressway are also being repaired or constructed. Similarly, flyovers and expansion joints of bridges are also being replaced.

Copyright Business Recorder, 2022

Comments

Comments are closed.