BR100 Increased By (1.77%)
BR30 Increased By (1.96%)
KSE100 Increased By (1.59%)
KSE30 Increased By (1.65%)
BECO 5.62 Increased By ▲ 0.04 (0.72%)
BML 59.51 Decreased By ▼ -1.71 (-2.79%)
BOP 34.61 Increased By ▲ 0.93 (2.76%)
CNERGY 8.08 No Change ▼ 0.00 (0%)
DCL 12.05 Increased By ▲ 0.41 (3.52%)
FCCL 54.40 Increased By ▲ 2.26 (4.33%)
FCSC 5.52 Decreased By ▼ -0.11 (-1.95%)
FFL 18.05 Increased By ▲ 0.04 (0.22%)
FNEL 1.33 Decreased By ▼ -0.02 (-1.48%)
HUMNL 11.07 Increased By ▲ 0.03 (0.27%)
KEL 8.05 Increased By ▲ 0.21 (2.68%)
KOSM 5.88 Increased By ▲ 0.15 (2.62%)
MLCF 90.52 Increased By ▲ 4.01 (4.64%)
NBP 190.17 Increased By ▲ 5.87 (3.19%)
PACE 11.53 Decreased By ▼ -0.12 (-1.03%)
PAEL 41.07 Increased By ▲ 1.11 (2.78%)
PIAHCLA 25.84 Increased By ▲ 0.17 (0.66%)
PIBTL 17.51 Increased By ▲ 0.24 (1.39%)
PPL 225.84 Increased By ▲ 3.17 (1.42%)
PRL 34.63 Increased By ▲ 0.17 (0.49%)
PTC 64.62 Increased By ▲ 0.88 (1.38%)
SEARL 91.38 Increased By ▲ 0.92 (1.02%)
SSGC 26.97 Increased By ▲ 0.30 (1.12%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 69.16 Increased By ▲ 0.69 (1.01%)
TPLP 10.90 Decreased By ▼ -0.30 (-2.68%)
TREET 24.64 Decreased By ▼ -0.06 (-0.24%)
TRG 69.78 Decreased By ▼ -0.81 (-1.15%)
WAVES 11.16 Increased By ▲ 0.05 (0.45%)
WTL 1.27 No Change ▼ 0.00 (0%)

KARACHI: Mari Petroleum Company Limited (MPCL) has made a gas/condensate discovery resulting from its exploratory efforts at Bannu West-1 ST-1 Exploration Well drilled in Bannu West Block, located in North Waziristan, KP. MPCL is the Operator of Bannu West Block having 55 percent working interest along with OGDCL and ZPCL as joint venture partners having 35 percent and 10 percent working interest, respectively.

The well was spud-in on June 06, 2021 and successfully drilled down to the depth of 4,915 meters, with MPCL own rig. During testing, Lockhart Limestone formation flowed gas at the rate of around 25mmscfd with Wellhead Flow Pressure (WHFP) of 4,339 Psi and around 300bpd condensate at 32/64 inch choke size (Pre-acid). Further, Hangu Formation also has flowed gas at the rate of 1.6mmscfd with WHFP of 297 Psi at 32/64 inch choke size.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.