BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

PESHAWAR: An MoU between Oil & Gas Development Company Limited (OGDCL), Energy & Power Department, Irrigation Department and Public Health Engineering Department of Khyber Pakhtunkhwa has been inked to construct a dam for Nashpa Greater Water Supply Scheme (NGWSS) in District Karak, KP.

Large population of Nashpa block had been facing acute shortage of drinking water, as there was neither ground water potential to feed them with deep wells/tubes wells nor they had any perennial spring/ source to be developed to establish a water supply scheme to meet the drinking water requirements of the area.

Therefore, an agreement was signed between OGDCL, MOL and the notables of surroundings of Nashpa Field to construct a Dam at suitable site where gravity flow could be maintained to 11 villages of Nashpa i.e (Lorgai, Sanda Manzai, Salkhani, Sand Khurram, Nashpa, Faqiri Banda, Zanrraka Banda, Pirmila, Paindi Banda, Mir Kalam and Khazi Bai). The population of Nashpa block is about 21,916 people with a water demand of approximately 15 GPCD is about 328,745 Gallons, 0.611 cusec or 442.240 acre-ft/year.

The proposed dam is located at a distance of 24 KM North-East of Karak city. The site is accessible after 54 KM from Kohat on Indus highway towards left side with an un-metalled road via village Shaheedan. Currently, OGDCL is providing drinking water through bowzers on daily basis to meet the requirement of locals of Nashpa area with cost of Rs16.63 million per year. Since signing of OGDCL agreement in the year 2012, it has always honoured its obligations and approval & execution of NGWSS depicts fulfilment of another commitment in this regard.

The Nashpa Dam project for Karak was approved in principle by OGDCL on 13th May 2020 with the condition that necessary analysis and proper estimation/ PC-1 would be shared with the Board for formal approval.

Keeping in view the limited technical capacity regarding construction of dam, the project in principle was shifted to the Government of KP which would execute it through its relevant line departments.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.

Stock investors Apr 06, 2022 09:54am
OGDC have failed to do their basic job which is oil and gas explorations , and now they wants to mingle in new ventures And that too without a Chairman since last many years , current Chairman who is also BOP Chairman visits ogdc office once in a year
0