BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)

PESHAWAR: An MoU between Oil & Gas Development Company Limited (OGDCL), Energy & Power Department, Irrigation Department and Public Health Engineering Department of Khyber Pakhtunkhwa has been inked to construct a dam for Nashpa Greater Water Supply Scheme (NGWSS) in District Karak, KP.

Large population of Nashpa block had been facing acute shortage of drinking water, as there was neither ground water potential to feed them with deep wells/tubes wells nor they had any perennial spring/ source to be developed to establish a water supply scheme to meet the drinking water requirements of the area.

Therefore, an agreement was signed between OGDCL, MOL and the notables of surroundings of Nashpa Field to construct a Dam at suitable site where gravity flow could be maintained to 11 villages of Nashpa i.e (Lorgai, Sanda Manzai, Salkhani, Sand Khurram, Nashpa, Faqiri Banda, Zanrraka Banda, Pirmila, Paindi Banda, Mir Kalam and Khazi Bai). The population of Nashpa block is about 21,916 people with a water demand of approximately 15 GPCD is about 328,745 Gallons, 0.611 cusec or 442.240 acre-ft/year.

The proposed dam is located at a distance of 24 KM North-East of Karak city. The site is accessible after 54 KM from Kohat on Indus highway towards left side with an un-metalled road via village Shaheedan. Currently, OGDCL is providing drinking water through bowzers on daily basis to meet the requirement of locals of Nashpa area with cost of Rs16.63 million per year. Since signing of OGDCL agreement in the year 2012, it has always honoured its obligations and approval & execution of NGWSS depicts fulfilment of another commitment in this regard.

The Nashpa Dam project for Karak was approved in principle by OGDCL on 13th May 2020 with the condition that necessary analysis and proper estimation/ PC-1 would be shared with the Board for formal approval.

Keeping in view the limited technical capacity regarding construction of dam, the project in principle was shifted to the Government of KP which would execute it through its relevant line departments.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.

Stock investors Apr 06, 2022 09:54am
OGDC have failed to do their basic job which is oil and gas explorations , and now they wants to mingle in new ventures And that too without a Chairman since last many years , current Chairman who is also BOP Chairman visits ogdc office once in a year
0