AIRLINK 72.00 Increased By ▲ 0.31 (0.43%)
BOP 4.95 Decreased By ▼ -0.05 (-1%)
CNERGY 4.35 Decreased By ▼ -0.04 (-0.91%)
DFML 28.36 Decreased By ▼ -0.19 (-0.67%)
DGKC 81.60 Decreased By ▼ -0.80 (-0.97%)
FCCL 21.49 Decreased By ▼ -0.46 (-2.1%)
FFBL 32.90 Decreased By ▼ -1.25 (-3.66%)
FFL 9.92 Decreased By ▼ -0.16 (-1.59%)
GGL 10.58 Increased By ▲ 0.46 (4.55%)
HBL 113.25 Increased By ▲ 0.25 (0.22%)
HUBC 139.53 Decreased By ▼ -0.97 (-0.69%)
HUMNL 9.03 Increased By ▲ 1.00 (12.45%)
KEL 4.49 Increased By ▲ 0.11 (2.51%)
KOSM 4.38 Decreased By ▼ -0.12 (-2.67%)
MLCF 37.45 Decreased By ▼ -0.56 (-1.47%)
OGDC 133.90 Decreased By ▼ -0.79 (-0.59%)
PAEL 26.02 Decreased By ▼ -0.60 (-2.25%)
PIAA 23.75 Decreased By ▼ -1.65 (-6.5%)
PIBTL 6.49 Decreased By ▼ -0.06 (-0.92%)
PPL 123.01 Increased By ▲ 1.06 (0.87%)
PRL 27.00 Decreased By ▼ -0.73 (-2.63%)
PTC 13.80 No Change ▼ 0.00 (0%)
SEARL 54.97 Increased By ▲ 0.08 (0.15%)
SNGP 68.99 Decreased By ▼ -0.71 (-1.02%)
SSGC 10.35 Decreased By ▼ -0.05 (-0.48%)
TELE 8.56 Increased By ▲ 0.06 (0.71%)
TPLP 11.25 Increased By ▲ 0.30 (2.74%)
TRG 61.35 Increased By ▲ 0.45 (0.74%)
UNITY 25.20 Decreased By ▼ -0.02 (-0.08%)
WTL 1.47 Increased By ▲ 0.19 (14.84%)
BR100 7,604 Decreased By -33.6 (-0.44%)
BR30 24,898 Decreased By -73.8 (-0.3%)
KSE100 72,557 Decreased By -204.3 (-0.28%)
KSE30 23,541 Decreased By -83.7 (-0.35%)
Print Print 2021-07-08

Azhar says power sector is on the upbeat

ISLAMABAD: Minister for Energy, Hammad Azhar said on Wednesday that the county has achieved highest demand and ...
Published July 8, 2021

ISLAMABAD: Minister for Energy, Hammad Azhar said on Wednesday that the country has achieved highest demand and supply of power at 24,284 MW. “It reflects not just higher demand and generation but also increased transmission capacity,” he added. In contrast, he said, highest generation and transmission achieved before PTI government was 20,811 MW in July 2018.

The officials of National Power Control Centre (NPCC), an arm of National Transmission and Despatch Company (NTDC) recently disclosed during a hearing in Nepra that current transmission capacity is 25,000 MW.

Meanwhile, a spokesperson of Power Division has clarified that Minister for Energy Muhammad Hammad Azhar has already issued directions to SNGPL to provide maximum gas supplies in order to ensure seamless power supply during summer months. Accordingly, SNGPL has already increased gas supplies to750 mmcfd from 685 mmcfd, he added.

The original RLNG requirement planned by NPCC for August, September and October 2021 was as follows: (i) August 900 MMCFD; (ii) September 900 MMCFD; and (iii) October 705 MMCFD. This implies that the consumers will continue to pay higher price due to less supply of RLNG to power plants vis-à-vis their requirements.

Power Division maintains that the committed volumes are quite inadequate to meet power generation requirements during the high peak summer months, adding that reduced RLNG allocation to power sector will result in increased consumption of RFO/ HSD which is highly uneconomical.

The spokesperson said that SNGPL is making efforts to provide maximum RLNG to the power sector. The spokesperson maintained that on restoration of gas supplies to the power plant after dry-docking, the electricity situation in the country has improved and there was no forced load management since 5:00 pm Friday, 2nd July 2021. He said that although there is no substantial improvement in the hydel electricity generation, demand is being met through well planned generation through alternative fuels in the country.

The spokesperson said inflows and outflows of water at national reservoirs and other factors relating to electricity generation are being constantly monitored. Alternative plans for electricity generation through use of other fuels and their supply chain are also ready.

Copyright Business Recorder, 2021

Comments

Comments are closed.