BR100 Increased By (0.99%)
BR30 Increased By (0.38%)
KSE100 Increased By (1.06%)
KSE30 Increased By (1.14%)
BECO 5.39 Increased By ▲ 0.07 (1.32%)
BML 56.48 Increased By ▲ 1.39 (2.52%)
BOP 35.09 Increased By ▲ 0.05 (0.14%)
CNERGY 8.17 Increased By ▲ 0.08 (0.99%)
DCL 11.44 Increased By ▲ 0.08 (0.7%)
FCCL 57.55 Increased By ▲ 1.36 (2.42%)
FCSC 5.00 Decreased By ▼ -0.01 (-0.2%)
FFL 17.88 Increased By ▲ 0.20 (1.13%)
FNEL 1.25 Increased By ▲ 0.01 (0.81%)
HUMNL 11.17 Increased By ▲ 0.24 (2.2%)
KEL 8.54 Decreased By ▼ -0.03 (-0.35%)
KOSM 6.73 Increased By ▲ 0.24 (3.7%)
MLCF 106.91 Increased By ▲ 0.40 (0.38%)
NBP 198.50 Decreased By ▼ -1.26 (-0.63%)
PACE 11.07 Increased By ▲ 0.05 (0.45%)
PAEL 45.45 Increased By ▲ 0.45 (1%)
PIAHCLA 31.43 Increased By ▲ 2.86 (10.01%)
PIBTL 19.08 Increased By ▲ 0.81 (4.43%)
PPL 242.62 Decreased By ▼ -1.87 (-0.76%)
PRL 35.67 Increased By ▲ 0.73 (2.09%)
PTC 65.52 Decreased By ▼ -0.30 (-0.46%)
SEARL 94.54 Increased By ▲ 0.49 (0.52%)
SSGC 32.08 Increased By ▲ 1.25 (4.05%)
TELE 8.87 Increased By ▲ 0.17 (1.95%)
THCCL 65.66 Increased By ▲ 0.67 (1.03%)
TPLP 10.73 Increased By ▲ 0.47 (4.58%)
TREET 25.11 Increased By ▲ 0.24 (0.97%)
TRG 63.67 Increased By ▲ 0.31 (0.49%)
WAVES 10.70 Increased By ▲ 0.05 (0.47%)
WTL 1.25 Increased By ▲ 0.01 (0.81%)

PESHAWAR: Pakhtunkhwa Energy Development Organization (PEDO) has sacked Project Director (PD) Karora Hydro Power Project over poor performance while three other PDs have been issued show-cause notices over slow utilization of funds allocated for energy sector projects.

According to notifications issued by Pakhtunkhwa Energy Development Organization (PEDO), the Project Director of the 11.8MW Karora Hydro Power Project (district Shangla), Ijaz Shinwari has been removed from his post over poor performance and his employment contract has also been suspended.

Similarly, the Project Directors of 84MW Mataltan and 157MW Madiyan Hydro Power Project, district Swat and 69MW Lavi Hydropower Project, district Chitral have also been issued show-cause notices over showing laxity in the utilization of funds allocated for these projects.

Chief Executive Officer (CEO) PEDO, Engineer Naeem Khan has warned the staff working on energy projects against laxity and negligence in performance of their duties. He has said that energy projects should be completed within their specified time frame in any circumstances.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.