BR100 Increased By (0.99%)
BR30 Increased By (0.38%)
KSE100 Increased By (1.06%)
KSE30 Increased By (1.14%)
BECO 5.39 Increased By ▲ 0.07 (1.32%)
BML 56.48 Increased By ▲ 1.39 (2.52%)
BOP 35.09 Increased By ▲ 0.05 (0.14%)
CNERGY 8.17 Increased By ▲ 0.08 (0.99%)
DCL 11.44 Increased By ▲ 0.08 (0.7%)
FCCL 57.55 Increased By ▲ 1.36 (2.42%)
FCSC 5.00 Decreased By ▼ -0.01 (-0.2%)
FFL 17.88 Increased By ▲ 0.20 (1.13%)
FNEL 1.25 Increased By ▲ 0.01 (0.81%)
HUMNL 11.17 Increased By ▲ 0.24 (2.2%)
KEL 8.54 Decreased By ▼ -0.03 (-0.35%)
KOSM 6.73 Increased By ▲ 0.24 (3.7%)
MLCF 106.91 Increased By ▲ 0.40 (0.38%)
NBP 198.50 Decreased By ▼ -1.26 (-0.63%)
PACE 11.07 Increased By ▲ 0.05 (0.45%)
PAEL 45.45 Increased By ▲ 0.45 (1%)
PIAHCLA 31.43 Increased By ▲ 2.86 (10.01%)
PIBTL 19.08 Increased By ▲ 0.81 (4.43%)
PPL 242.62 Decreased By ▼ -1.87 (-0.76%)
PRL 35.67 Increased By ▲ 0.73 (2.09%)
PTC 65.52 Decreased By ▼ -0.30 (-0.46%)
SEARL 94.54 Increased By ▲ 0.49 (0.52%)
SSGC 32.08 Increased By ▲ 1.25 (4.05%)
TELE 8.87 Increased By ▲ 0.17 (1.95%)
THCCL 65.66 Increased By ▲ 0.67 (1.03%)
TPLP 10.73 Increased By ▲ 0.47 (4.58%)
TREET 25.11 Increased By ▲ 0.24 (0.97%)
TRG 63.67 Increased By ▲ 0.31 (0.49%)
WAVES 10.70 Increased By ▲ 0.05 (0.47%)
WTL 1.25 Increased By ▲ 0.01 (0.81%)

ISLAMABAD: The Capital Development Authority (CDA) has opened technical bids for development works in sub-sector I-15/4. The technical bids will be evaluated by a committee. According to the CDA, the financial bids of only technically-qualified firms will be opened.

In order to start development activities in sub-sector I-15/4, the authority invited bids from companies registered in Pakistan Engineering Council in category C-3 or above through advertisement published in national dailies.

In response to the advertisement, renowned firms submitted their technical and financial bids and technical bids have now been opened, which will be followed by opening of financial bids.

Infrastructure development works in I-15 sub-sector are already being carried out at a fast pace.

In this context, after completing survey work on several roads and streets earth work is in progress, while survey on the roads and streets is also being carried out simultaneously.

The Sector I-15 was launched nearly two decades ago, particularly to accommodate low-income citizens. However, despite the allotment of plots, no step regarding its development was taken since its launch.

The incumbent management of the CDA, in line with its policy to take up the development work in the stalled sectors and uplift of infrastructure development of the city, revived the project and decided to address the problems faced by those who were allotted plots and were stuck in Sector I-15 since long.

Copyright Business Recorder, 2020

Comments

Comments are closed for this article.