BR100 Increased By (1.82%)
BR30 Increased By (1.76%)
KSE100 Increased By (2.08%)
KSE30 Increased By (2.29%)
BECO 5.39 No Change ▼ 0.00 (0%)
BML 57.46 Increased By ▲ 0.98 (1.74%)
BOP 36.31 Increased By ▲ 1.22 (3.48%)
CNERGY 8.21 Increased By ▲ 0.04 (0.49%)
DCL 11.83 Increased By ▲ 0.39 (3.41%)
FCCL 59.28 Increased By ▲ 1.73 (3.01%)
FCSC 5.01 Increased By ▲ 0.01 (0.2%)
FFL 17.85 Decreased By ▼ -0.03 (-0.17%)
FNEL 1.26 Increased By ▲ 0.01 (0.8%)
HUMNL 11.50 Increased By ▲ 0.33 (2.95%)
KEL 8.33 Decreased By ▼ -0.21 (-2.46%)
KOSM 6.63 Decreased By ▼ -0.10 (-1.49%)
MLCF 107.43 Increased By ▲ 0.52 (0.49%)
NBP 205.01 Increased By ▲ 6.51 (3.28%)
PACE 11.10 Increased By ▲ 0.03 (0.27%)
PAEL 45.42 Decreased By ▼ -0.03 (-0.07%)
PIAHCLA 31.76 Increased By ▲ 0.33 (1.05%)
PIBTL 18.85 Decreased By ▼ -0.23 (-1.21%)
PPL 243.74 Increased By ▲ 1.12 (0.46%)
PRL 36.24 Increased By ▲ 0.57 (1.6%)
PTC 72.07 Increased By ▲ 6.55 (10%)
SEARL 94.58 Increased By ▲ 0.04 (0.04%)
SSGC 31.85 Decreased By ▼ -0.23 (-0.72%)
TELE 9.02 Increased By ▲ 0.15 (1.69%)
THCCL 68.47 Increased By ▲ 2.81 (4.28%)
TPLP 10.72 Decreased By ▼ -0.01 (-0.09%)
TREET 25.89 Increased By ▲ 0.78 (3.11%)
TRG 64.31 Increased By ▲ 0.64 (1.01%)
WAVES 10.91 Increased By ▲ 0.21 (1.96%)
WTL 1.29 Increased By ▲ 0.04 (3.2%)
By

QUETTA: Coordinator to Chief Minister Balochistan Mir Abdul Rauf Rind called on Chairman China-Pakistan Economic Corridor Authority (CPECA), Lieutenant General Asim Saleem Bajwa (retd) at his office. During the meeting, Mir Abdul Rauf Rind had a detailed discussion with the Chairman CPECA regarding the damage caused by insurgency in Tehsil Mand and Tehsil Dasht area of Kech District, destruction of infrastructure and their rehabilitation.

Mir Abdul Rauf Rind handed over the concept paper to chairman CPECA regarding re-vamping of schools, hospitals, roads, infrastructure and construction of new infrastructure in Tehsil Mand and Tehsil Dasht and requested him to pay special attention to these areas. Electricity in Dasht Tehsil, problems faced by people and other issues were discussed in detail and Mir Abdul Rauf Rind said that due to lack of grid station, there was no electricity in the entire Tehsil. Aware of the system supply requirements, he said that a feasibility report regarding Dasht grid station would be submitted soon.

Comments

Comments are closed for this article.