AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,629 Increased By 103 (1.37%)
BR30 24,842 Increased By 192.5 (0.78%)
KSE100 72,743 Increased By 771.4 (1.07%)
KSE30 24,034 Increased By 284.8 (1.2%)
Business & Finance

NHA plans to build new bridge to connect Karachi with Balochistan

  • Due to recent rains the flood relay damaged the extra support of the bridge pillars.
Published September 22, 2020

The Lasbela Chamber of Commerce has welcomed the announcement of repair of the Hub River Bridge connecting Karachi with Balochistan alongside the construction of a new bridge, which would join Karachi with the province.

As per details, Lasbela Chamber of Commerce President Ismail Sattar said that General Manager of National Highway Authority (NHA) Balochistan South Sham Sundar has informed him about the move in a meeting. He said that according to Sham Sundar, the chairman of NHA has issued orders regarding the plan for the early construction of the new bridge.

He said that the present bridge was constructed in 1962 and it is still usable. Ismail Sattar informed the General Manager NHA that the existing bridge has become inadequate due to the increase in heavy traffic. Furthermore, due to recent rains the flood relay damaged the extra support of the bridge pillars.

Ismail Sattar said there was a serious risk of damage to the bridge if sand mining on both sides of the bridge was not strictly stopped. He said the Lasbela area is the largest regulated industrial area in the province, accounting for more than 75pc of the province's revenue.

Comments

Comments are closed.