AIRLINK 74.60 Decreased By ▼ -0.65 (-0.86%)
BOP 5.14 Increased By ▲ 0.03 (0.59%)
CNERGY 4.50 Decreased By ▼ -0.10 (-2.17%)
DFML 33.00 Increased By ▲ 0.47 (1.44%)
DGKC 88.90 Decreased By ▼ -1.45 (-1.6%)
FCCL 22.55 Decreased By ▼ -0.43 (-1.87%)
FFBL 32.70 Decreased By ▼ -0.87 (-2.59%)
FFL 9.84 Decreased By ▼ -0.20 (-1.99%)
GGL 10.88 Decreased By ▼ -0.17 (-1.54%)
HBL 115.31 Increased By ▲ 0.41 (0.36%)
HUBC 136.63 Decreased By ▼ -0.71 (-0.52%)
HUMNL 9.97 Increased By ▲ 0.44 (4.62%)
KEL 4.63 Decreased By ▼ -0.03 (-0.64%)
KOSM 4.70 No Change ▼ 0.00 (0%)
MLCF 39.70 Decreased By ▼ -0.84 (-2.07%)
OGDC 138.96 Decreased By ▼ -0.79 (-0.57%)
PAEL 26.89 Decreased By ▼ -0.76 (-2.75%)
PIAA 25.15 Increased By ▲ 0.75 (3.07%)
PIBTL 6.84 Decreased By ▼ -0.08 (-1.16%)
PPL 122.74 Decreased By ▼ -2.56 (-2.04%)
PRL 27.01 Decreased By ▼ -0.54 (-1.96%)
PTC 14.00 Decreased By ▼ -0.15 (-1.06%)
SEARL 59.47 Decreased By ▼ -2.38 (-3.85%)
SNGP 71.15 Decreased By ▼ -1.83 (-2.51%)
SSGC 10.44 Decreased By ▼ -0.15 (-1.42%)
TELE 8.65 Decreased By ▼ -0.13 (-1.48%)
TPLP 11.51 Decreased By ▼ -0.22 (-1.88%)
TRG 65.13 Decreased By ▼ -1.47 (-2.21%)
UNITY 25.80 Increased By ▲ 0.65 (2.58%)
WTL 1.41 Decreased By ▼ -0.03 (-2.08%)
BR100 7,819 Increased By 16.2 (0.21%)
BR30 25,577 Decreased By -238.9 (-0.93%)
KSE100 74,664 Increased By 132.8 (0.18%)
KSE30 24,072 Increased By 117.1 (0.49%)

KARACHI: The two-day annual inspection by the CEO, and Federal Government Inspector of Railways (FGIR) for Karachi division concluded on Tuesday. The special team comprised of FGIR Asif Mateen Zaidi, Chief Engineer (Open Line) Shahrukh Afshar, Divisional Superintendent Karachi Arshad Salam Khattak, Chief Commercial Manager Rubina Nasir, representatives of different branches from PR Headquarters Lahore and divisional officers from Karachi division.

The annual CEO & FGIR inspection is the highest level inspection of railway infrastructure, especially its track followed by the annual DS Special, quarterly inspection by Divisional Engineer, monthly by Assistant Executive Engineer, weekly by Permanent Works Inspector and daily by mates.

Almost 408 kilometers of rail track of Karachi division, 227 kilometers from Karachi to Tando Adam on ML-I and 181 kilometers from Kotri to Dadu on ML-II, along with different stations, manned and unmanned level crossings and bridges were thoroughly inspected.

The level between the rails was repeatedly examined during the CEO & FGIR inspection with special focus at curvatures, level crossings and bridges. Preparedness of staff at level crossings was judged by inquiring them the troubleshooting of accidental and tricky scenarios. Cash prizes were also given to the staff possessing expertise and skills in coping with risky situations.

The paraphernalia available to the level crossing staff was checked and works stores enroute were visited by the CEO & FGIR special team. The strength and durability of bridges were also gauged.

Copyright Business Recorder, 2020

Comments

Comments are closed.