BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)

Lucky Cement Limited Pakistan has planned to sell additional electricity to the Peshawar Electricity Supply Company (Pesco) through its plant in Darra Pezu to ensure smooth supply of electricity to district Lakki Marwat and Dera Ismail Khan of Khyber Pakhtunkhwa.
In a press release issued here on Tuesday said that the company is holding meetings with the Pesco for selling 15 to 20MW electricity in order to overcome with the prevailing electricity crisis in district Lakki Marwat and Dera Ismail Khan and adjacent areas of Lucky Cement's Plant.
The Lucky Cement has its own power generation units at both the production facilities of Karachi and Darra Pezu, Khyber Pakhtunkhwa. These power generation units are capable of producing around 175MW of electricity all together and since 2010 both the plants have installed state-of-the-art Waste Heat Recovery (WHR) systems that are contributing an additional 22MW of electricity converted out of the wasted heat it captures and reuses to produce energy. The company has the ability to meet growing energy needs of the country, which is much willing to sell the additional electricity to the KP government.

Copyright Business Recorder, 2012

Comments

Comments are closed for this article.