BR100 Increased By (0.44%)
BR30 Increased By (1.39%)
KSE100 Increased By (0.62%)
KSE30 Increased By (0.61%)
BECO 5.43 Decreased By ▼ -0.06 (-1.09%)
BML 55.69 Decreased By ▼ -1.07 (-1.89%)
BOP 35.38 Increased By ▲ 0.26 (0.74%)
CNERGY 8.20 Increased By ▲ 0.05 (0.61%)
DCL 11.55 Increased By ▲ 0.04 (0.35%)
FCCL 58.36 Increased By ▲ 1.61 (2.84%)
FCSC 5.12 Decreased By ▼ -0.03 (-0.58%)
FFL 17.84 Decreased By ▼ -0.04 (-0.22%)
FNEL 1.25 No Change ▼ 0.00 (0%)
HUMNL 11.07 Decreased By ▼ -0.05 (-0.45%)
KEL 8.75 Increased By ▲ 0.33 (3.92%)
KOSM 6.69 Increased By ▲ 0.11 (1.67%)
MLCF 107.15 Increased By ▲ 3.85 (3.73%)
NBP 201.73 Increased By ▲ 1.55 (0.77%)
PACE 11.30 Increased By ▲ 0.01 (0.09%)
PAEL 44.49 Increased By ▲ 1.02 (2.35%)
PIAHCLA 29.41 Increased By ▲ 1.92 (6.98%)
PIBTL 18.64 Increased By ▲ 0.94 (5.31%)
PPL 247.98 Increased By ▲ 3.66 (1.5%)
PRL 35.29 Decreased By ▼ -0.14 (-0.4%)
PTC 66.14 Increased By ▲ 0.79 (1.21%)
SEARL 95.49 Increased By ▲ 2.17 (2.33%)
SSGC 32.04 Decreased By ▼ -0.90 (-2.73%)
TELE 8.87 Decreased By ▼ -0.04 (-0.45%)
THCCL 66.61 Decreased By ▼ -0.11 (-0.16%)
TPLP 10.57 Decreased By ▼ -0.26 (-2.4%)
TREET 25.30 Increased By ▲ 0.18 (0.72%)
TRG 64.40 Decreased By ▼ -0.50 (-0.77%)
WAVES 10.90 Decreased By ▼ -0.03 (-0.27%)
WTL 1.26 Increased By ▲ 0.01 (0.8%)

In a major development, Water and Power Development Authority (Wapda) Monday completed Dhan Gali Bridge at a cost of rupees 1.012 billion across River Jhelum in the upper reaches of Mangla Reservoir, about 45 kilometres from Rawat at Islamabad-Dudial Road.
Wapda spokesman said that after the completion of approach roads, the bridge is likely to be opened for traffic by end of June 2011. He said the Dhan Gali Bridge is a part of compensation and resettlement package of Mangla Dam Raising Project. Wapda started construction in November 2008 by employing a state-of-the-art technology and completed work in a short span of two and a half years. It is a pre-stressed post-tensioned balanced cantilever box girder bridge with a total length of 1,116 feet, he apprised. He further said that the bridge is to accommodate two lanes with its roadway width of 28 feet.
Briefing about the completed project, Mangla Dam Raising Project General Manager, Rashid Ali Bangash said that construction of the bridge would open a new era of accelerated development for the entire region, as the bridge will provide an all-weather and all-traffic facility. Not only the distance between Dudial and Islamabad would reduce by 125 kilometres, but a minimum of two to three hours travel time would also be saved, he added.

Copyright Business Recorder, 2011

Comments

Comments are closed for this article.