BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)
Print Print edition: 2010-12-29

Power shortfall touches 3,000 megawatts

Published Updated

Electricity consumers across the country have start facing approximately five-hour daily load shedding from December 26, likely to continue until January 31 due to canal desilting campaign. The power shortfall recorded during last 24 hours stood at 3000MW, inching up fast with diminishing hydel resources due to canal desilting campaign. Power generation remained 10015MW against a demand of 12931MW.
Hydel generation was recorded at 2565MW, against 1546MW through thermal, 5842MW through IPPs and 62MW through RPPs. Supply to the KESC remained 690MW. It may be noted that the Pakistan Electric Power Company (Pepco) Managing Director, Rasul Khan Mahsud had announced new schedule of load shedding last Friday. He had assured that there would not be any unscheduled load shedding and the company would soon announce the detailed schedule. Last year, there had been 4,500 MW electricity shortfall, however, this year it would not exceed from 1,500MW, he added.
He had informed that the Pepco had paid Rs 26 billion to PSO, while the company had Rs 33 billion more in hand for payment to PSO in order to get better supply of furnace oil for thermal production in coming month. "Pepco has been assured of better fuel supply from Pakistan State Oil, he maintained."

Copyright Business Recorder, 2010

Comments

Comments are closed for this article.