BR100 Decreased By (-0.7%)
BR30 Decreased By (-0.77%)
KSE100 Decreased By (-0.53%)
KSE30 Decreased By (-0.55%)
BECO 5.66 Decreased By ▼ -0.02 (-0.35%)
BML 63.53 Decreased By ▼ -1.31 (-2.02%)
BOP 33.60 No Change ▼ 0.00 (0%)
CNERGY 8.14 Decreased By ▼ -0.10 (-1.21%)
DCL 11.40 Increased By ▲ 0.05 (0.44%)
FCCL 52.18 Decreased By ▼ -0.73 (-1.38%)
FCSC 5.52 No Change ▼ 0.00 (0%)
FFL 17.75 Decreased By ▼ -0.05 (-0.28%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.20 Decreased By ▼ -0.04 (-0.36%)
KEL 7.88 Decreased By ▼ -0.09 (-1.13%)
KOSM 5.63 Increased By ▲ 0.19 (3.49%)
MLCF 85.75 Decreased By ▼ -0.26 (-0.3%)
NBP 184.00 Decreased By ▼ -1.00 (-0.54%)
PACE 11.68 Decreased By ▼ -0.34 (-2.83%)
PAEL 40.30 Increased By ▲ 0.09 (0.22%)
PIAHCLA 25.87 Increased By ▲ 0.14 (0.54%)
PIBTL 17.05 Decreased By ▼ -0.27 (-1.56%)
PPL 224.70 Decreased By ▼ -0.60 (-0.27%)
PRL 34.60 Increased By ▲ 0.22 (0.64%)
PTC 64.19 Decreased By ▼ -1.27 (-1.94%)
SEARL 90.40 Decreased By ▼ -0.11 (-0.12%)
SSGC 26.56 Decreased By ▼ -0.20 (-0.75%)
TELE 9.08 Increased By ▲ 0.12 (1.34%)
THCCL 67.23 Decreased By ▼ -2.21 (-3.18%)
TPLP 11.40 Increased By ▲ 0.09 (0.8%)
TREET 24.70 Increased By ▲ 0.15 (0.61%)
TRG 71.14 Decreased By ▼ -0.53 (-0.74%)
WAVES 10.91 Decreased By ▼ -0.54 (-4.72%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

The disconnection and recovery campaign of Peshawar Electricity Supply Company (Pesco) against defaulting government departments was in full swing in the province as nine more government connections have been disconnected in Peshawar Circle for non-payment of their outstanding arrears.
The government departments, whose power supply was disconnected included four connections of Town-I Peshawar, two connections of SDO Public Health Engineering Matta, and one connection each of SDO Public Health Engineering Shabqadar, WS Shabqadar and WSS Nasratzai have been disconnected due to non-payment of arrears.
Implementing the directives of Chief Executive Pesco Brigadier Sakhi Marjan. The Pesco field staff has started the disconnection and recovery campaign since last month which is in full swing, and a number of defaulting departments have already been disconnected and million of rupees have been recovered so far.
The operation in this regard was is in progress against the other defaulting government departments who have not yet cleared their arrears. All federal, provincial and local bodies institutions and domestic consumers have been urged once again to deposit their arears in their own interest so that their power supply may not be disconnected.

Copyright Business Recorder, 2007

Comments

Comments are closed for this article.