AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageISLAMABAD: Minister for Railway Khawaja Saad Rafique on Thursday said there was a proposal for laying a new railway track from Havelian to Khunjerab (Pak-China border).

Replying to a question in the Upper House, he said the project would be taken as part of long-term plan of the China Pakistan Economic Corridor (CPEC) 2025-30 which would usher in socio-economic development of the country.

He said a pre-feasibility study had been carried out by two foreign consulting firms during 2007 and 2008 with an estimated cost of US$10.500 billion.

He added a PC-II had been submitted to Planning Commission for detailed feasibility study of the proposed link. Answering another question, he said contract agreement for procurement of 55 D.E locomotives (4000-4500HP) had been signed with M/S G.E USA, adding the delivery schedule was between December, 2016-17.

He said with available stock of locomotives Pakistan Railways was running 10 freight trains per day ex-port Karachi.

He said after June 2017 with addition of 55 D.E locomotives, Pakistan Railways would be able to run 12 more freight trains per day in addition to existing freight trains.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.