AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.12 Increased By ▲ 0.07 (1.39%)
CNERGY 4.41 Decreased By ▼ -0.01 (-0.23%)
DFML 37.77 Increased By ▲ 1.93 (5.39%)
DGKC 91.34 Increased By ▲ 3.34 (3.8%)
FCCL 22.65 Increased By ▲ 0.45 (2.03%)
FFBL 32.93 Increased By ▲ 0.21 (0.64%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 11.05 Increased By ▲ 0.25 (2.31%)
HBL 115.87 Decreased By ▼ -0.03 (-0.03%)
HUBC 136.10 Increased By ▲ 0.26 (0.19%)
HUMNL 10.01 Increased By ▲ 0.17 (1.73%)
KEL 4.61 No Change ▼ 0.00 (0%)
KOSM 4.84 Increased By ▲ 0.18 (3.86%)
MLCF 40.55 Increased By ▲ 0.67 (1.68%)
OGDC 137.90 No Change ▼ 0.00 (0%)
PAEL 26.61 Increased By ▲ 0.18 (0.68%)
PIAA 25.85 Decreased By ▼ -0.43 (-1.64%)
PIBTL 6.78 Increased By ▲ 0.02 (0.3%)
PPL 123.11 Increased By ▲ 0.21 (0.17%)
PRL 26.86 Increased By ▲ 0.17 (0.64%)
PTC 13.95 Decreased By ▼ -0.05 (-0.36%)
SEARL 58.91 Increased By ▲ 0.21 (0.36%)
SNGP 70.22 Decreased By ▼ -0.18 (-0.26%)
SSGC 10.40 Increased By ▲ 0.04 (0.39%)
TELE 8.64 Increased By ▲ 0.08 (0.93%)
TPLP 11.20 Decreased By ▼ -0.18 (-1.58%)
TRG 64.36 Increased By ▲ 0.13 (0.2%)
UNITY 26.10 Increased By ▲ 0.05 (0.19%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,857 Increased By 19.2 (0.25%)
BR30 25,550 Increased By 90.2 (0.35%)
KSE100 75,131 Increased By 200 (0.27%)
KSE30 24,165 Increased By 18.8 (0.08%)

imageISLAMABAD: The Punjab Government has allocated Rs. 570 million for the construction of un-manned railways crossings in Punjab.

An official in the Ministry of Railways told APP that 65 percent railways level crossings were un-manned across the country which were needed to be constructed to avoid any untoward incident.

He said that in the past railways level crossing had been constructed on political basis.

To construct the un-manned level crossing in Khyber Pakhtunkhwa Chief Minister Pervaiz Khattak has committed to allocate Rs. 150 million but response from Sindh and Balochistan provinces was still awaited, he added.

He said the Ministry requested all the provinces to cooperate on the matter so that within limited time all the un-manned level crossing could be constructed.

Copyright APP (Associated Press of Pakistan), 2015

Comments

Comments are closed.