AIRLINK 74.25 Decreased By ▼ -0.35 (-0.47%)
BOP 5.05 Decreased By ▼ -0.09 (-1.75%)
CNERGY 4.42 Decreased By ▼ -0.08 (-1.78%)
DFML 35.84 Increased By ▲ 2.84 (8.61%)
DGKC 88.00 Decreased By ▼ -0.90 (-1.01%)
FCCL 22.20 Decreased By ▼ -0.35 (-1.55%)
FFBL 32.72 Increased By ▲ 0.02 (0.06%)
FFL 9.79 Decreased By ▼ -0.05 (-0.51%)
GGL 10.80 Decreased By ▼ -0.08 (-0.74%)
HBL 115.90 Increased By ▲ 0.59 (0.51%)
HUBC 135.84 Decreased By ▼ -0.79 (-0.58%)
HUMNL 9.84 Decreased By ▼ -0.13 (-1.3%)
KEL 4.61 Decreased By ▼ -0.02 (-0.43%)
KOSM 4.66 Decreased By ▼ -0.04 (-0.85%)
MLCF 39.88 Increased By ▲ 0.18 (0.45%)
OGDC 137.90 Decreased By ▼ -1.06 (-0.76%)
PAEL 26.43 Decreased By ▼ -0.46 (-1.71%)
PIAA 26.28 Increased By ▲ 1.13 (4.49%)
PIBTL 6.76 Decreased By ▼ -0.08 (-1.17%)
PPL 122.90 Increased By ▲ 0.16 (0.13%)
PRL 26.69 Decreased By ▼ -0.32 (-1.18%)
PTC 14.00 No Change ▼ 0.00 (0%)
SEARL 58.70 Decreased By ▼ -0.77 (-1.29%)
SNGP 70.40 Decreased By ▼ -0.75 (-1.05%)
SSGC 10.36 Decreased By ▼ -0.08 (-0.77%)
TELE 8.56 Decreased By ▼ -0.09 (-1.04%)
TPLP 11.38 Decreased By ▼ -0.13 (-1.13%)
TRG 64.23 Decreased By ▼ -0.90 (-1.38%)
UNITY 26.05 Increased By ▲ 0.25 (0.97%)
WTL 1.38 Decreased By ▼ -0.03 (-2.13%)
BR100 7,838 Increased By 19.2 (0.24%)
BR30 25,460 Decreased By -117.2 (-0.46%)
KSE100 74,931 Increased By 266.7 (0.36%)
KSE30 24,146 Increased By 74.2 (0.31%)

electricityISLAMABAD: Electricity shortfall dropped to 2,822 megawatt after a decrease in electricity demand in the country.

According to Pakistan Electric Power Company (PEPCO), power generation in the country is 14,732 while the demand is 17,554 megawatt, private news channel reported.

The water resources are generating 5,910 megawatt, thermal 2,085, independent power producers 6,596 and rental power plants are generating 141 megawatt of electricity in the country.

The Karachi electric supply corporation is being supplied 650 megawatt.

After the decrease in electricity shortfall, the loadshedding is reduced to six hours in urban areas and eight hours in rural areas.

Complain for unscheduled loadshedding have also been minimised after the drop in the electricity shortfall.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed.