BR100 Decreased By (-0.23%)
BR30 Decreased By (-0.01%)
KSE100 Decreased By (-0.19%)
KSE30 Decreased By (-0.24%)
AGHA 7.75 Increased By ▲ 0.06 (0.78%)
BECO 5.30 Decreased By ▼ -0.01 (-0.19%)
BML 59.50 Decreased By ▼ -1.73 (-2.83%)
BOP 36.54 Increased By ▲ 0.54 (1.5%)
CNERGY 12.19 Increased By ▲ 0.94 (8.36%)
CSIL 6.16 Decreased By ▼ -0.01 (-0.16%)
FCCL 57.41 Increased By ▲ 0.53 (0.93%)
FFL 16.57 Increased By ▲ 0.06 (0.36%)
FNEL 1.20 No Change ▼ 0.00 (0%)
KEL 7.34 Decreased By ▼ -0.08 (-1.08%)
KOSM 6.06 Increased By ▲ 0.01 (0.17%)
LOTCHEM 27.15 Decreased By ▼ -0.05 (-0.18%)
MLCF 102.20 Decreased By ▼ -0.89 (-0.86%)
NBP 206.70 Decreased By ▼ -0.93 (-0.45%)
NCPL 62.36 Increased By ▲ 0.44 (0.71%)
NPL 71.80 Decreased By ▼ -0.38 (-0.53%)
OGDC 319.00 Increased By ▲ 0.51 (0.16%)
PACE 11.33 Increased By ▲ 0.27 (2.44%)
PAEL 43.84 Decreased By ▼ -0.54 (-1.22%)
PIBTL 16.86 Decreased By ▼ -0.04 (-0.24%)
PPL 221.50 Decreased By ▼ -0.98 (-0.44%)
PRL 63.75 Decreased By ▼ -0.06 (-0.09%)
PTC 72.00 Decreased By ▼ -1.16 (-1.59%)
SSGC 27.33 Increased By ▲ 0.08 (0.29%)
TBL 9.88 No Change ▼ 0.00 (0%)
TELE 8.75 Decreased By ▼ -0.06 (-0.68%)
TPL 20.70 Increased By ▲ 0.36 (1.77%)
TPLP 15.04 Increased By ▲ 0.07 (0.47%)
TREET 24.12 Increased By ▲ 0.02 (0.08%)
TRG 63.25 Increased By ▲ 0.88 (1.41%)
Pakistan

Power shortfall reaches 5000 MW

ISLAMABAD : The power shortfall has reached 5000 again due to wrong policies of the government. The duration of loads
Published Updated

high-tension-wireISLAMABAD: The power shortfall has reached 5000 again due to wrong policies of the government.

The duration of loadshedding in Karachi has reached 15 hours. Currently, electricity demand in the country is 17904 megawatts while the electricity production has been reduced to 12995 megawatts, private news channel reported.

The hydral power generation capacity in the country is 6510 megawatts but the production is 5141 megawatts.

The power generation capacity of IPPs is 7000 megawatts while the production is 5800 megawatts.

Meanwhile, 1941 megawatts of electricity is produced from Gencos despite a generation capacity of 2500 megawatts.

Moreover, 710 megawatt electricity is also provided to KESC.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed for this article.