BR100 No Change (0%)
BR30 No Change (0%)
KSE100 Increased By (1.43%)
KSE30 Increased By (1.47%)
AGHA 6.12 Increased By ▲ 0.09 (1.49%)
BECO 4.16 Increased By ▲ 0.30 (7.77%)
BML 62.73 Increased By ▲ 1.73 (2.84%)
BOP 30.90 Increased By ▲ 2.81 (10%)
CNERGY 11.97 Increased By ▲ 0.23 (1.96%)
CSIL 5.42 Increased By ▲ 0.12 (2.26%)
FCCL 56.78 Increased By ▲ 2.32 (4.26%)
FFL 13.34 Increased By ▲ 0.27 (2.07%)
FNEL 1.15 Increased By ▲ 0.04 (3.6%)
KEL 6.00 Increased By ▲ 0.37 (6.57%)
KOSM 5.48 Increased By ▲ 0.14 (2.62%)
LOTCHEM 24.37 Increased By ▲ 0.54 (2.27%)
MLCF 97.49 Increased By ▲ 4.51 (4.85%)
NBP 174.50 Increased By ▲ 11.30 (6.92%)
NCPL 48.47 Increased By ▲ 0.20 (0.41%)
NPL 50.23 Increased By ▲ 0.52 (1.05%)
OGDC 310.47 Increased By ▲ 6.84 (2.25%)
PACE 9.05 Increased By ▲ 0.08 (0.89%)
PAEL 33.07 Increased By ▲ 1.16 (3.64%)
PIBTL 13.15 Increased By ▲ 0.41 (3.22%)
PPL 217.17 Increased By ▲ 4.26 (2%)
PRL 85.66 Increased By ▲ 1.32 (1.57%)
PTC 46.19 Increased By ▲ 1.20 (2.67%)
SSGC 23.32 Increased By ▲ 0.49 (2.15%)
TBL 9.02 Increased By ▲ 0.14 (1.58%)
TELE 6.73 Increased By ▲ 0.23 (3.54%)
TPL 26.10 Increased By ▲ 1.84 (7.58%)
TPLP 12.67 Increased By ▲ 0.68 (5.67%)
TREET 23.80 Increased By ▲ 0.66 (2.85%)
TRG 53.17 Increased By ▲ 1.70 (3.3%)

imageKARACHI: President, Federation of Pakistan Chambers of Commerce and Industry (FPCCI) Zakria Usman has shown his concern over non-completion of Lyari Expressway; which was scheduled to be completed in December 2009.

In a statement here on Friday, FPCCI chief said the project was commenced in 2002 and so far 67 percent of its work has been completed.

He drew the attention of Prime Minister Muhammad Nawaz Sharif towards the delay in construction of Lyari Expressway and requested him to direct National Highway Authority (NHA) to complete the expressway on top priority basis.

Zakaria Usman said the government should remove all impediments in construction of the Lyari Expressway and provide maximum relief to the masses by completing this important project.

FPCCI's Vice President Ismail Suttar added that due to tremendous increase in the traffic and frequent traffic jams causing difficulties to the people mainly those traveling in South and West districts of the city.

Ismail Suttar , who is also President of Lasbella Chamber of Commerce and Industry ( LCCI), said that the traffic between Karachi and Hub town of Balochistan onwards Quetta through RCD Highway and Northern Bypass has also increased. This causes delay in reaching the destination due to mismanaged traffic on both the roads providing links for Baluchistan and Sindh.

The flow of the traffic between industrial area of Hub and other parts of Lasbela and Shershah also remains disturbed leading to traffic jams. The completion of Lyari Expressway will greatly help in easing the traffic flow in the city especially between South and West of Karachi.

Comments

Comments are closed for this article.