AIRLINK 74.25 Decreased By ▼ -0.35 (-0.47%)
BOP 5.05 Decreased By ▼ -0.09 (-1.75%)
CNERGY 4.42 Decreased By ▼ -0.08 (-1.78%)
DFML 35.84 Increased By ▲ 2.84 (8.61%)
DGKC 88.00 Decreased By ▼ -0.90 (-1.01%)
FCCL 22.20 Decreased By ▼ -0.35 (-1.55%)
FFBL 32.72 Increased By ▲ 0.02 (0.06%)
FFL 9.79 Decreased By ▼ -0.05 (-0.51%)
GGL 10.80 Decreased By ▼ -0.08 (-0.74%)
HBL 115.90 Increased By ▲ 0.59 (0.51%)
HUBC 135.84 Decreased By ▼ -0.79 (-0.58%)
HUMNL 9.84 Decreased By ▼ -0.13 (-1.3%)
KEL 4.61 Decreased By ▼ -0.02 (-0.43%)
KOSM 4.66 Decreased By ▼ -0.04 (-0.85%)
MLCF 39.88 Increased By ▲ 0.18 (0.45%)
OGDC 137.90 Decreased By ▼ -1.06 (-0.76%)
PAEL 26.43 Decreased By ▼ -0.46 (-1.71%)
PIAA 26.28 Increased By ▲ 1.13 (4.49%)
PIBTL 6.76 Decreased By ▼ -0.08 (-1.17%)
PPL 122.90 Increased By ▲ 0.16 (0.13%)
PRL 26.69 Decreased By ▼ -0.32 (-1.18%)
PTC 14.00 No Change ▼ 0.00 (0%)
SEARL 58.70 Decreased By ▼ -0.77 (-1.29%)
SNGP 70.40 Decreased By ▼ -0.75 (-1.05%)
SSGC 10.36 Decreased By ▼ -0.08 (-0.77%)
TELE 8.56 Decreased By ▼ -0.09 (-1.04%)
TPLP 11.38 Decreased By ▼ -0.13 (-1.13%)
TRG 64.23 Decreased By ▼ -0.90 (-1.38%)
UNITY 26.05 Increased By ▲ 0.25 (0.97%)
WTL 1.38 Decreased By ▼ -0.03 (-2.13%)
BR100 7,838 Increased By 19.2 (0.24%)
BR30 25,460 Decreased By -117.2 (-0.46%)
KSE100 74,931 Increased By 266.7 (0.36%)
KSE30 24,146 Increased By 74.2 (0.31%)

imageISLAMABAD: The government is in process of implementing around 29 different wind power projects as per its plan to enhance power production in the country.

Among these projects, two wind power projects with capacity of 106.4 MW have achieved commercial operation and are supplying electricity to national grid.

Besides, three projects, having a cumulative capacity of 150 MW, have achieved financial close and are under construction. These projects are expected to achieve Commercial Operation Date (COD) during this year.

According to official information issued by Ministry of Water and Power here on Tuesday, six wind power projects with a cumulative capacity of 330 MW are close to achieving Project Financial Closing. The expected COD dates for these projects are 2015.

Additionally, there are 11 wind power projects with a cumulative capacity of 550 MW may also achieve COD by second quarter of 2016, provided the tariff is made available timely while 12 wind power projects with cumulative capacity of 789 MW are at different stages of implementation.

Comments

Comments are closed.