BR100 Increased By (0.12%)
BR30 Increased By (0.28%)
KSE100 Increased By (0.26%)
KSE30 Increased By (0.26%)
AGHA 7.63 Increased By ▲ 0.04 (0.53%)
BECO 5.57 Increased By ▲ 0.06 (1.09%)
BML 59.74 Increased By ▲ 0.66 (1.12%)
BOP 34.40 Increased By ▲ 0.29 (0.85%)
CNERGY 13.11 Increased By ▲ 0.27 (2.1%)
CSIL 6.41 Increased By ▲ 0.31 (5.08%)
FCCL 58.06 Increased By ▲ 0.40 (0.69%)
FFL 16.23 Increased By ▲ 0.03 (0.19%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.43 Decreased By ▼ -0.05 (-0.67%)
KOSM 6.03 Increased By ▲ 0.09 (1.52%)
LOTCHEM 27.67 Decreased By ▼ -0.32 (-1.14%)
MLCF 102.75 Increased By ▲ 2.10 (2.09%)
NBP 205.06 Increased By ▲ 1.31 (0.64%)
NCPL 59.63 Decreased By ▼ -0.94 (-1.55%)
NPL 68.56 Decreased By ▼ -1.40 (-2%)
OGDC 318.92 Decreased By ▼ -1.37 (-0.43%)
PACE 11.05 Decreased By ▼ -0.05 (-0.45%)
PAEL 43.10 Decreased By ▼ -0.02 (-0.05%)
PIBTL 16.63 Increased By ▲ 0.07 (0.42%)
PPL 229.45 Increased By ▲ 0.61 (0.27%)
PRL 70.80 Decreased By ▼ -0.22 (-0.31%)
PTC 71.00 Decreased By ▼ -0.65 (-0.91%)
SSGC 27.41 Increased By ▲ 0.73 (2.74%)
TBL 10.31 Increased By ▲ 0.50 (5.1%)
TELE 8.53 Decreased By ▼ -0.08 (-0.93%)
TPL 23.06 Increased By ▲ 0.82 (3.69%)
TPLP 15.76 Increased By ▲ 0.65 (4.3%)
TREET 24.71 Increased By ▲ 0.58 (2.4%)
TRG 60.29 Increased By ▲ 0.45 (0.75%)

ISLAMABD: The Energy Limited of Fauji Fertilizer Company (FFC) has all set to achieve financial close in the current month for setting up 49.5 MW wind power project at Jhampir, Dist. Thatta, Sindh and the project will be completed and commissioned within 16 months.

The first ever energy purchase agreement of wind project in the entire Alternative Energy Sector in the country was signed between FFC Energy Limited and Central Power Purchasing Agency (CPPA).

The Energy Limited (EL) is pursuing development of 49.5 MW wind power project to be installed at Jhampir, Dist. Thatta, Sindh and Alternative Energy Development Board (AEDB) has already issued Letter of Intent (LOI) to EL.

The land for the project was allocated by AEDB in 2007 on which EL carried out detailed feasibility study. The IPP achieved their first major milestone when they signed the EPC contract with Nordex and Descon Engineering in April 2010.

Nordex will supply 33 S77 (1.5MW) wind turbines for which the towers would be manufactured locally.

The EL was awarded the tariff for their project by NEPRA in August 2010. The Letter of Support (LOS) was also issued to the IPP in December 2010.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed for this article.