BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)
Top News

‘Unscheduled load shedding ends’

Published Updated

 ISLAMABAD: Federal Minister for Water and Power Syed Naveed Qamar on Tuesday said that unscheduled load shedding, both for industrial and domestic consumers, has ended after improving power generation.

He was talking to a delegation of Sialkot Chamber of Commerce and Industry, who called on him along with MNA Khawaja Asif.

The minister said that electricity issues of export oriented industry of Sialkot would be resolved on priority and efforts would be made for smooth power supply to the industry for maximum duration.

He said that due to canal closure the gap between demand and supply had widened. However, the demand-supply gap is being managed through maximum generation from thermal plants.

Qamar also directed CEO of Gujranwala Electric Supply Company to visit Sialkot Chamber and finalize load management plan.

He also asked Sialkot Chamber to identify the names of industrial dominated feeders so that proper arrangements may be made to provide them uninterrupted power supply.

Earlier, President, Sialkot Chamber of Commerce, Naeem Anwar Qureshi said that Sialkot was facing problems due to power outages and asked the Minister to resolve it on priority so that they may be able to complete their export consignments timely to earn foreign exchange for the country.

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed for this article.