BR100 Increased By (1.77%)
BR30 Increased By (1.96%)
KSE100 Increased By (1.59%)
KSE30 Increased By (1.65%)
BECO 5.62 Increased By ▲ 0.04 (0.72%)
BML 59.51 Decreased By ▼ -1.71 (-2.79%)
BOP 34.61 Increased By ▲ 0.93 (2.76%)
CNERGY 8.08 No Change ▼ 0.00 (0%)
DCL 12.05 Increased By ▲ 0.41 (3.52%)
FCCL 54.40 Increased By ▲ 2.26 (4.33%)
FCSC 5.52 Decreased By ▼ -0.11 (-1.95%)
FFL 18.05 Increased By ▲ 0.04 (0.22%)
FNEL 1.33 Decreased By ▼ -0.02 (-1.48%)
HUMNL 11.07 Increased By ▲ 0.03 (0.27%)
KEL 8.05 Increased By ▲ 0.21 (2.68%)
KOSM 5.88 Increased By ▲ 0.15 (2.62%)
MLCF 90.52 Increased By ▲ 4.01 (4.64%)
NBP 190.17 Increased By ▲ 5.87 (3.19%)
PACE 11.53 Decreased By ▼ -0.12 (-1.03%)
PAEL 41.07 Increased By ▲ 1.11 (2.78%)
PIAHCLA 25.84 Increased By ▲ 0.17 (0.66%)
PIBTL 17.51 Increased By ▲ 0.24 (1.39%)
PPL 225.84 Increased By ▲ 3.17 (1.42%)
PRL 34.63 Increased By ▲ 0.17 (0.49%)
PTC 64.62 Increased By ▲ 0.88 (1.38%)
SEARL 91.38 Increased By ▲ 0.92 (1.02%)
SSGC 26.97 Increased By ▲ 0.30 (1.12%)
TELE 8.93 Increased By ▲ 0.02 (0.22%)
THCCL 69.16 Increased By ▲ 0.69 (1.01%)
TPLP 10.90 Decreased By ▼ -0.30 (-2.68%)
TREET 24.64 Decreased By ▼ -0.06 (-0.24%)
TRG 69.78 Decreased By ▼ -0.81 (-1.15%)
WAVES 11.16 Increased By ▲ 0.05 (0.45%)
WTL 1.27 No Change ▼ 0.00 (0%)

ISLAMABAD: Pakistan Railways (PR) has replaced old mechanical signaling with Computerized Interlocking System (CBIS) at 22 railway stations to prevent accidents and ensure smooth train operation from Mirpur Mathelo to Shehdapur.

“The work at the Bin Qasim Station is near to completion that will help improve the trains operations and ensure safety of passengers,” an official in the Ministry of Railways told APP on Monday.

Regarding the Shahdara-Lodhran project, he said as many as 15 railway stations had become operational after being upgraded with modern signaling system, while work on the remaining stations would be completed by the end of 2018.

He said that after the completion of the project, the line capacity of Karachi to Lahore Main Line (ML-I) will increase from 36 trains to 100 per day.

After the activation of new signaling system, the number of passengers in cargo trains would increase, resulting in increased revenue and better operation management, he added.

To a question, the official said that Pakistan Railways had introduced a Trains Collision Avoidance System (TCAS) to prevent accidents at unmanned level crossings.

He said that five sets will be installed shortly and kept under observation after which commercial production for installing the system at the remaining level crossings will be commenced.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.