BR100 Increased By (1.02%)
BR30 Increased By (1.68%)
KSE100 Increased By (0.98%)
KSE30 Increased By (1.06%)
AGHA 7.69 Increased By ▲ 0.23 (3.08%)
BECO 5.31 Increased By ▲ 0.04 (0.76%)
BML 61.23 Increased By ▲ 3.97 (6.93%)
BOP 36.00 Increased By ▲ 1.25 (3.6%)
CNERGY 11.25 Increased By ▲ 0.19 (1.72%)
CSIL 6.17 Increased By ▲ 0.34 (5.83%)
FCCL 56.88 Increased By ▲ 0.46 (0.82%)
FFL 16.51 Increased By ▲ 0.10 (0.61%)
FNEL 1.20 No Change ▼ 0.00 (0%)
KEL 7.42 Increased By ▲ 0.10 (1.37%)
KOSM 6.05 Decreased By ▼ -0.10 (-1.63%)
LOTCHEM 27.20 Increased By ▲ 0.08 (0.29%)
MLCF 103.09 Increased By ▲ 5.15 (5.26%)
NBP 207.63 Increased By ▲ 0.75 (0.36%)
NCPL 61.92 Increased By ▲ 5.50 (9.75%)
NPL 72.18 Increased By ▲ 6.41 (9.75%)
OGDC 318.49 Increased By ▲ 2.19 (0.69%)
PACE 11.06 Increased By ▲ 0.19 (1.75%)
PAEL 44.38 Increased By ▲ 2.08 (4.92%)
PIBTL 16.90 Increased By ▲ 0.12 (0.72%)
PPL 222.48 Increased By ▲ 1.79 (0.81%)
PRL 63.81 Increased By ▲ 0.16 (0.25%)
PTC 73.16 Increased By ▲ 1.34 (1.87%)
SSGC 27.25 Increased By ▲ 0.17 (0.63%)
TBL 9.88 Increased By ▲ 0.16 (1.65%)
TELE 8.81 Increased By ▲ 0.08 (0.92%)
TPL 20.34 Increased By ▲ 0.94 (4.85%)
TPLP 14.97 Increased By ▲ 0.19 (1.29%)
TREET 24.10 Increased By ▲ 0.70 (2.99%)
TRG 62.37 Increased By ▲ 0.96 (1.56%)
World

Rescued Indian tunnel worker returns to dig

Published Updated
Photo: Reuters
Photo: Reuters
By

NEW DELHI: Construction has resumed on an Indian tunnel that collapsed last year, trapping 41 workers for 17 days – with at least one of those men back on the job, reports Tuesday said.

Manik Talukdar, a worker from Bengal who was among those trapped in the under-construction Silkyara road tunnel, told the Times of India he was “on my way back” to his underground job.

“It was a fateful thing, but that doesn’t mean we should stop working out of fear,” he told the paper.

Most of the trapped men were migrant workers who travelled hundreds of kilometres from home to work on the tunnel in northern Uttarakhand state, high in the bitterly cold Himalayan foothills.

The men survived in the tunnel following the November 12 collapse with the help of a narrow tube through which air, food and water were delivered as they waited.

Rescuers drill to send more food to trapped workers in Indian tunnel

But Talukdar shrugged off fears of another collapse. “We are aware of the risks involved in our job,” he said.

After repeated setbacks in the rescue operation, including falling debris, fears of further cave-ins and drilling machine breakdowns, military engineers and skilled miners dug the final section by hand using a so-called rat-hole technique.

A three-person team worked at the rock face inside a metal pipe wide enough for just one man, with the rescuer in front digging and handing material to the person behind him.

The highways ministry gave permission last week for work to resume, nearly two months after the collapse.

Comments

Comments are closed for this article.