BR100 Increased By (0.93%)
BR30 Increased By (0.67%)
KSE100 Increased By (0.88%)
KSE30 Increased By (0.99%)
AGHA 6.10 No Change ▼ 0.00 (0%)
BECO 3.88 Decreased By ▼ -0.15 (-3.72%)
BML 59.99 Decreased By ▼ -0.71 (-1.17%)
BOP 28.66 Increased By ▲ 0.01 (0.03%)
CNERGY 14.08 Increased By ▲ 1.28 (10%)
CSIL 5.19 Increased By ▲ 0.22 (4.43%)
FCCL 52.61 Decreased By ▼ -0.22 (-0.42%)
FFL 12.99 Increased By ▲ 0.05 (0.39%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 5.96 Increased By ▲ 0.13 (2.23%)
KOSM 5.29 Decreased By ▼ -0.01 (-0.19%)
LOTCHEM 24.47 Increased By ▲ 0.34 (1.41%)
MLCF 91.03 Decreased By ▼ -0.35 (-0.38%)
NBP 162.10 Decreased By ▼ -2.87 (-1.74%)
NCPL 49.01 Decreased By ▼ -1.08 (-2.16%)
NPL 52.41 Decreased By ▼ -0.90 (-1.69%)
OGDC 306.21 Increased By ▲ 2.53 (0.83%)
PACE 9.25 Decreased By ▼ -0.05 (-0.54%)
PAEL 32.72 Decreased By ▼ -0.10 (-0.3%)
PIBTL 13.08 Increased By ▲ 0.05 (0.38%)
PPL 215.52 Increased By ▲ 0.44 (0.2%)
PRL 100.81 Increased By ▲ 6.65 (7.06%)
PTC 46.02 Increased By ▲ 3.18 (7.42%)
SSGC 23.14 Increased By ▲ 0.20 (0.87%)
TBL 9.14 Decreased By ▼ -0.47 (-4.89%)
TELE 6.81 No Change ▼ 0.00 (0%)
TPL 24.76 Increased By ▲ 0.88 (3.69%)
TPLP 12.29 Decreased By ▼ -0.15 (-1.21%)
TREET 23.98 Increased By ▲ 0.28 (1.18%)
TRG 53.08 Decreased By ▼ -0.54 (-1.01%)

LAHORE: The caretaker Chief Minister Punjab Mohsin Naqvi conducted an inspection of the ongoing development works at the under-construction “Band Road Controlled Access Corridor Project,” here on Monday.

The CM specifically observed the construction progress of walls around the corridor in Package One. Providing directives to the contractor of Package 2, he emphasized the need to expedite the corridor walls’ construction and urged for the timely completion of the project.

The CM highlighted that the project’s completion would facilitate immediate motorway access from any area in Lahore, ultimately saving significant time and fuel costs.

The Controlled Access Corridor spans from Niazi Chowk to Sagian Interchange in Package One and Sigian Interchange to Babu Sabu Interchange in Package Two.

Copyright Business Recorder, 2023

Comments

Comments are closed for this article.