BR100 Increased By (0.24%)
BR30 Increased By (0.42%)
KSE100 Increased By (0.27%)
KSE30 Increased By (0.2%)
AGHA 7.51 Decreased By ▼ -0.02 (-0.27%)
BECO 5.12 Increased By ▲ 0.01 (0.2%)
BML 60.52 Increased By ▲ 2.22 (3.81%)
BOP 34.65 Increased By ▲ 0.07 (0.2%)
CNERGY 14.05 Increased By ▲ 0.37 (2.7%)
CSIL 6.37 Increased By ▲ 0.07 (1.11%)
FCCL 57.48 Decreased By ▼ -0.07 (-0.12%)
FFL 16.36 Decreased By ▼ -0.14 (-0.85%)
FNEL 1.21 Increased By ▲ 0.01 (0.83%)
KEL 7.35 Decreased By ▼ -0.01 (-0.14%)
KOSM 6.02 Increased By ▲ 0.04 (0.67%)
LOTCHEM 27.60 Increased By ▲ 0.09 (0.33%)
MLCF 101.97 Increased By ▲ 0.04 (0.04%)
NBP 203.52 Increased By ▲ 0.23 (0.11%)
NCPL 60.61 Increased By ▲ 0.14 (0.23%)
NPL 69.76 Decreased By ▼ -0.04 (-0.06%)
OGDC 319.00 Increased By ▲ 0.52 (0.16%)
PACE 11.12 No Change ▼ 0.00 (0%)
PAEL 43.00 Increased By ▲ 0.14 (0.33%)
PIBTL 16.75 Increased By ▲ 0.03 (0.18%)
PPL 232.00 Increased By ▲ 1.38 (0.6%)
PRL 82.65 Increased By ▲ 5.92 (7.72%)
PTC 71.55 Increased By ▲ 0.37 (0.52%)
SSGC 27.17 Increased By ▲ 0.07 (0.26%)
TBL 10.16 Decreased By ▼ -0.12 (-1.17%)
TELE 8.56 No Change ▼ 0.00 (0%)
TPL 23.40 Decreased By ▼ -0.19 (-0.81%)
TPLP 15.74 Increased By ▲ 0.29 (1.88%)
TREET 24.50 Decreased By ▼ -0.01 (-0.04%)
TRG 59.70 Decreased By ▼ -0.39 (-0.65%)

KARACHI: Administrator Karachi Barrister Murtaza Wahab on Friday directed the Director General Engineering Department of Karachi Metropolitan Corporation (KMC) to complete the under-construction roads within the stipulated 45 days in any case.

Officials said that the Engineering Department is carrying out construction and lining of more than 20 roads in different areas of the city under special grant of Rs.1 billion from the Sindh government.

The roads of District Central where construction work has started immediately included Gharibabad to Usman Memorial Hospital, Madina Masjid Food Street, Ziauddin Hospital Chowrangi to Mujahid Colony, Sir Syed Girls College to Lasbela Chowrangi, Bada Maidan to Khilifat Chowk and M. Mateen Food Road. These roads are being constructed at a cost of Rs. 50 million each.

In East District University Road, Sindhi Muslim Society Chowrangi and Commercial Area, Link Road Tipu Sultan, Mubarak Shaheed Road is being constructed.

In South District, construction work is in progress on Shahrah e Attar and adjacent areas, Shahrah e Iran, Shahrah e Liaquat, MA Jinnah Road at a cost of Rs. 50 million each.

Similarly in Malir district, Khalid Bin Waleed Road is under construction from Bhens Colony to Mehran Highway. Hyedri Chowk Road, Ammar Yasir Phase One and internal streets, and the road from Qadeer Chowk to Nafees Cinema are also under construction.

In West and Keamari Districts, Jackson Market Road and adjacent areas roads and Site Flyover to Lyari Expressway are also being repaired or constructed. Similarly, flyovers and expansion joints of bridges are also being replaced.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.