BR100 Increased By (0.36%)
BR30 Decreased By (-0.13%)
KSE100 Increased By (0.22%)
KSE30 Increased By (0.37%)
AGHA 6.68 Increased By ▲ 0.01 (0.15%)
BECO 4.37 No Change ▼ 0.00 (0%)
BML 57.32 Increased By ▲ 0.88 (1.56%)
BOP 30.35 Increased By ▲ 0.01 (0.03%)
CNERGY 13.12 Increased By ▲ 0.03 (0.23%)
CSIL 5.41 Increased By ▲ 0.05 (0.93%)
FCCL 52.79 Increased By ▲ 0.41 (0.78%)
FFL 14.72 Decreased By ▼ -0.02 (-0.14%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 6.09 No Change ▼ 0.00 (0%)
KOSM 5.73 Increased By ▲ 0.77 (15.52%)
LOTCHEM 26.46 Decreased By ▼ -0.89 (-3.25%)
MLCF 93.16 Increased By ▲ 0.41 (0.44%)
NBP 164.66 Decreased By ▼ -0.32 (-0.19%)
NCPL 55.66 Increased By ▲ 0.02 (0.04%)
NPL 61.16 Decreased By ▼ -0.10 (-0.16%)
OGDC 316.73 Decreased By ▼ -1.03 (-0.32%)
PACE 9.87 Decreased By ▼ -0.06 (-0.6%)
PAEL 35.63 Increased By ▲ 0.13 (0.37%)
PIBTL 14.68 Increased By ▲ 0.11 (0.75%)
PPL 226.91 Decreased By ▼ -0.88 (-0.39%)
PRL 93.02 Increased By ▲ 0.45 (0.49%)
PTC 60.26 Decreased By ▼ -0.37 (-0.61%)
SSGC 23.81 Increased By ▲ 0.01 (0.04%)
TBL 8.75 Increased By ▲ 0.07 (0.81%)
TELE 7.80 Increased By ▲ 0.02 (0.26%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 Increased By ▲ 0.30 (2.37%)
TREET 22.16 Decreased By ▼ -0.38 (-1.69%)
TRG 56.56 Decreased By ▼ -1.24 (-2.15%)

ISLAMABAD: Senate Standing Committee on Power has held General Electric (GE) as technically responsible for damage to Guddu 747MW combined cycle thermal power plant (Block-V) in February this year.

The sources said, Central Power Purchasing Generation Company (CPGCL) (GENCO-11) Guddu had signed a contract service agreement with M/s General Electric (GE) OEM, in respect of 747MW, combined cycle power plant Guddu for a period of 16 years.

Guddu power plant damage: Power Div wants ‘independent’ probe

Under the agreement GE is responsible for scheduled inspection, supply of initial spares, diagnostics and online performance monitoring, O&M advisory services, asset performance management operational excellence system as these are included in the scope of covered maintenance.

The BoD of CPGCL argued that major areas like legal, commercial were not covered in the report and stance of M/s GE had not been taken before arriving at conclusions. The Board has advised that a complete picture after covering all the commercial and legal aspects be placed before the Senate Standing Committee on Power or any other forum, as may be required.

Copyright Business Recorder, 2021

Comments

Comments are closed for this article.