AIRLINK 73.28 Increased By ▲ 0.28 (0.38%)
BOP 5.39 Increased By ▲ 0.04 (0.75%)
CNERGY 4.34 Increased By ▲ 0.03 (0.7%)
DFML 27.57 Decreased By ▼ -0.98 (-3.43%)
DGKC 76.77 Increased By ▲ 2.48 (3.34%)
FCCL 20.53 Increased By ▲ 0.18 (0.88%)
FFBL 31.53 Increased By ▲ 0.63 (2.04%)
FFL 10.18 Increased By ▲ 0.12 (1.19%)
GGL 10.43 Increased By ▲ 0.04 (0.38%)
HBL 116.75 Increased By ▲ 0.78 (0.67%)
HUBC 136.10 Increased By ▲ 3.90 (2.95%)
HUMNL 6.73 Increased By ▲ 0.05 (0.75%)
KEL 4.18 Increased By ▲ 0.15 (3.72%)
KOSM 4.78 Increased By ▲ 0.18 (3.91%)
MLCF 39.15 Increased By ▲ 0.61 (1.58%)
OGDC 134.60 Increased By ▲ 0.75 (0.56%)
PAEL 23.66 Decreased By ▼ -0.17 (-0.71%)
PIAA 27.36 Increased By ▲ 0.23 (0.85%)
PIBTL 6.93 Increased By ▲ 0.17 (2.51%)
PPL 113.35 Increased By ▲ 0.55 (0.49%)
PRL 28.00 Decreased By ▼ -0.16 (-0.57%)
PTC 14.72 Decreased By ▼ -0.17 (-1.14%)
SEARL 56.60 Increased By ▲ 0.18 (0.32%)
SNGP 65.60 Decreased By ▼ -0.20 (-0.3%)
SSGC 11.08 Increased By ▲ 0.07 (0.64%)
TELE 9.04 Increased By ▲ 0.02 (0.22%)
TPLP 11.86 Decreased By ▼ -0.04 (-0.34%)
TRG 69.65 Increased By ▲ 0.55 (0.8%)
UNITY 23.82 Increased By ▲ 0.11 (0.46%)
WTL 1.34 Increased By ▲ 0.01 (0.75%)
BR100 7,505 Increased By 70.3 (0.95%)
BR30 24,498 Increased By 278.1 (1.15%)
KSE100 72,135 Increased By 775.5 (1.09%)
KSE30 23,819 Increased By 251.7 (1.07%)

ISLAMABAD: Senate Standing Committee on Power has held General Electric (GE) as technically responsible for damage to Guddu 747MW combined cycle thermal power plant (Block-V) in February this year.

The sources said, Central Power Purchasing Generation Company (CPGCL) (GENCO-11) Guddu had signed a contract service agreement with M/s General Electric (GE) OEM, in respect of 747MW, combined cycle power plant Guddu for a period of 16 years.

Guddu power plant damage: Power Div wants ‘independent’ probe

Under the agreement GE is responsible for scheduled inspection, supply of initial spares, diagnostics and online performance monitoring, O&M advisory services, asset performance management operational excellence system as these are included in the scope of covered maintenance.

The BoD of CPGCL argued that major areas like legal, commercial were not covered in the report and stance of M/s GE had not been taken before arriving at conclusions. The Board has advised that a complete picture after covering all the commercial and legal aspects be placed before the Senate Standing Committee on Power or any other forum, as may be required.

Copyright Business Recorder, 2021

Comments

Comments are closed.