BAFL 38.47 Increased By ▲ 0.02 (0.05%)
BIPL 17.49 Increased By ▲ 0.24 (1.39%)
BOP 3.97 Decreased By ▼ -0.10 (-2.46%)
CNERGY 3.04 Decreased By ▼ -0.04 (-1.3%)
DFML 16.26 Decreased By ▼ -0.29 (-1.75%)
DGKC 43.42 Decreased By ▼ -0.38 (-0.87%)
FABL 22.30 No Change ▼ 0.00 (0%)
FCCL 11.31 No Change ▼ 0.00 (0%)
FFL 6.44 Increased By ▲ 0.07 (1.1%)
GGL 9.27 Decreased By ▼ -0.22 (-2.32%)
HBL 90.44 Decreased By ▼ -0.06 (-0.07%)
HUBC 88.33 Increased By ▲ 0.63 (0.72%)
HUMNL 5.50 Increased By ▲ 0.01 (0.18%)
KEL 1.96 Decreased By ▼ -0.05 (-2.49%)
LOTCHEM 28.49 Decreased By ▼ -0.01 (-0.04%)
MLCF 29.94 Decreased By ▼ -0.26 (-0.86%)
OGDC 96.46 Decreased By ▼ -1.74 (-1.77%)
PAEL 9.94 Decreased By ▼ -0.05 (-0.5%)
PIBTL 3.86 Decreased By ▼ -0.03 (-0.77%)
PIOC 85.10 Decreased By ▼ -0.15 (-0.18%)
PPL 74.07 Decreased By ▼ -0.53 (-0.71%)
PRL 15.22 Decreased By ▼ -0.10 (-0.65%)
SILK 0.95 Decreased By ▼ -0.02 (-2.06%)
SNGP 46.98 Increased By ▲ 0.18 (0.38%)
SSGC 9.19 Decreased By ▼ -0.17 (-1.82%)
TELE 6.70 Decreased By ▼ -0.26 (-3.74%)
TPLP 12.24 Decreased By ▼ -0.09 (-0.73%)
TRG 88.02 Decreased By ▼ -2.13 (-2.36%)
UNITY 25.17 Decreased By ▼ -0.22 (-0.87%)
WTL 1.14 No Change ▼ 0.00 (0%)
BR100 4,626 Decreased By -30.1 (-0.65%)
BR30 16,569 Decreased By -93.8 (-0.56%)
KSE100 46,233 Decreased By -132.5 (-0.29%)
KSE30 15,989 Decreased By -183.2 (-1.13%)

ISLAMABAD: Senate Standing Committee on Power has held General Electric (GE) as technically responsible for damage to Guddu 747MW combined cycle thermal power plant (Block-V) in February this year.

The sources said, Central Power Purchasing Generation Company (CPGCL) (GENCO-11) Guddu had signed a contract service agreement with M/s General Electric (GE) OEM, in respect of 747MW, combined cycle power plant Guddu for a period of 16 years.

Guddu power plant damage: Power Div wants ‘independent’ probe

Under the agreement GE is responsible for scheduled inspection, supply of initial spares, diagnostics and online performance monitoring, O&M advisory services, asset performance management operational excellence system as these are included in the scope of covered maintenance.

The BoD of CPGCL argued that major areas like legal, commercial were not covered in the report and stance of M/s GE had not been taken before arriving at conclusions. The Board has advised that a complete picture after covering all the commercial and legal aspects be placed before the Senate Standing Committee on Power or any other forum, as may be required.

Copyright Business Recorder, 2021

Comments

Comments are closed.

Guddu power plant: GE held responsible for damage

Cut in rates of petroleum products

Meeting with Dr Shamshad: Banks, DFIs agree to set up private equity, venture funds

Moscow Format Consultations: Afghan govt asked to eliminate terrorist groups

Policeman martyred, 2 terrorists killed in attack in Mianwali

Income Tax return filing deadline extended to Oct 31

President dismisses FBR’s appeal against expats

Afghan embassy in India suspends operations

Five new cargo vessels heading for Ukrainian Black Sea ports

UN adopts new global rules to reduce chemicals harm

Rs63bn more than the target: Q1 tax collection stands at Rs2.041trn