AIRLINK 77.36 Decreased By ▼ -0.48 (-0.62%)
BOP 4.88 Increased By ▲ 0.01 (0.21%)
CNERGY 4.29 Increased By ▲ 0.01 (0.23%)
DFML 45.24 Increased By ▲ 0.24 (0.53%)
DGKC 86.06 Increased By ▲ 0.09 (0.1%)
FCCL 22.69 Increased By ▲ 0.24 (1.07%)
FFBL 31.80 Decreased By ▼ -0.20 (-0.63%)
FFL 9.47 Decreased By ▼ -0.03 (-0.32%)
GGL 10.14 Increased By ▲ 0.05 (0.5%)
HASCOL 6.63 Increased By ▲ 0.08 (1.22%)
HBL 111.00 Decreased By ▼ -1.00 (-0.89%)
HUBC 141.00 Decreased By ▼ -0.20 (-0.14%)
HUMNL 10.88 Decreased By ▼ -0.09 (-0.82%)
KEL 4.80 Decreased By ▼ -0.05 (-1.03%)
KOSM 4.35 No Change ▼ 0.00 (0%)
MLCF 38.15 Decreased By ▼ -0.10 (-0.26%)
OGDC 128.94 Increased By ▲ 0.05 (0.04%)
PAEL 25.32 Decreased By ▼ -0.19 (-0.74%)
PIBTL 6.44 Increased By ▲ 0.08 (1.26%)
PPL 117.39 Decreased By ▼ -0.11 (-0.09%)
PRL 25.89 Increased By ▲ 0.09 (0.35%)
PTC 13.80 Increased By ▲ 0.06 (0.44%)
SEARL 56.86 Decreased By ▼ -0.23 (-0.4%)
SNGP 64.79 Decreased By ▼ -0.20 (-0.31%)
SSGC 10.04 Increased By ▲ 0.04 (0.4%)
TELE 8.05 Decreased By ▼ -0.07 (-0.86%)
TPLP 10.45 Increased By ▲ 0.10 (0.97%)
TRG 64.58 Decreased By ▼ -0.66 (-1.01%)
UNITY 26.80 Decreased By ▼ -0.05 (-0.19%)
WTL 1.34 No Change ▼ 0.00 (0%)
BR100 7,814 Decreased By -21.2 (-0.27%)
BR30 25,169 Decreased By -76 (-0.3%)
KSE100 74,544 Decreased By -122.2 (-0.16%)
KSE30 23,856 Decreased By -63.2 (-0.26%)

KARACHI: Following the rains, the K-Electric Board of Directors (BoD) constituted a special committee to review the power utility’s performance during the rains and to identify gaps, if any, and to go over the proposed risk mitigation plan.

The committee conducted a thorough investigation with support from the management and subsequently approved a plan for the improvement and further upgrade of the system before the next monsoon season.

The BoD has approved an additional investment of Rs 9.5 billion for rain mitigation measures over and above budgeted investment of Rs 24.4 billion for the upgradation of infrastructure and advancement of protection in the distribution network approved earlier.

The Board also approved engagement of external consultant to review the project plan and further strengthen its execution. The upgradation project will include raising of distribution equipment foundation levels in areas water logged during recent rains, waterproofing of identified substations, replacing of old equipment and main cables at key identified locations, and increasing the capacity to augment the dewatering efforts made by civic agencies.

“The city received unprecedented rainfall of 730mm during this monsoon and while KE was able to keep its system functioning, it is important that upgradations are made to improve the availability of power to citizens. To this end, the utility will carry out all necessary actions to ensure enhanced service,” said Moonis Abdullah Alvi, CEO K-Electric.

The company is also making substantial investment in high loss area under its flagship Sarbulandi Project, which constitutes about 40% of the city, to improve service delivery and safety of the residents. These investments will also ensure the deployment of theft resistant Ariel Bundled Cables (ABC) in these areas, which will improve the safety standards and will bring more people on the legal network.

The Special Committee recommended formal engagement with and cooperation from all concerned stakeholders for taking timely steps before the next monsoon season such as clearance of the inter-city drainage systems and removal of encroachments to ensure that KE’s ability to provide power is not impaired during rain. The Special Committee also recommended to seek regulatory support from NEPRA on approval of infrastructure investments filed during Mid Term Review of KE tariff. —PR

Copyright Business Recorder, 2020

Comments

Comments are closed.