AIRLINK 74.49 Increased By ▲ 0.24 (0.32%)
BOP 5.06 Increased By ▲ 0.01 (0.2%)
CNERGY 4.42 No Change ▼ 0.00 (0%)
DFML 37.70 Increased By ▲ 1.86 (5.19%)
DGKC 90.85 Increased By ▲ 2.85 (3.24%)
FCCL 22.60 Increased By ▲ 0.40 (1.8%)
FFBL 32.80 Increased By ▲ 0.08 (0.24%)
FFL 9.72 Decreased By ▼ -0.07 (-0.72%)
GGL 10.92 Increased By ▲ 0.12 (1.11%)
HBL 116.00 Increased By ▲ 0.10 (0.09%)
HUBC 136.25 Increased By ▲ 0.41 (0.3%)
HUMNL 10.06 Increased By ▲ 0.22 (2.24%)
KEL 4.61 No Change ▼ 0.00 (0%)
KOSM 4.78 Increased By ▲ 0.12 (2.58%)
MLCF 40.48 Increased By ▲ 0.60 (1.5%)
OGDC 137.69 Decreased By ▼ -0.21 (-0.15%)
PAEL 26.60 Increased By ▲ 0.17 (0.64%)
PIAA 25.73 Decreased By ▼ -0.55 (-2.09%)
PIBTL 6.77 Increased By ▲ 0.01 (0.15%)
PPL 123.12 Increased By ▲ 0.22 (0.18%)
PRL 26.89 Increased By ▲ 0.20 (0.75%)
PTC 13.99 Decreased By ▼ -0.01 (-0.07%)
SEARL 58.99 Increased By ▲ 0.29 (0.49%)
SNGP 69.98 Decreased By ▼ -0.42 (-0.6%)
SSGC 10.40 Increased By ▲ 0.04 (0.39%)
TELE 8.63 Increased By ▲ 0.07 (0.82%)
TPLP 11.19 Decreased By ▼ -0.19 (-1.67%)
TRG 64.50 Increased By ▲ 0.27 (0.42%)
UNITY 26.44 Increased By ▲ 0.39 (1.5%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,851 Increased By 12.9 (0.16%)
BR30 25,546 Increased By 86.7 (0.34%)
KSE100 75,123 Increased By 192.7 (0.26%)
KSE30 24,165 Increased By 19.3 (0.08%)

LAHORE: Pakistan had lost approximately Rs 600 billion in the form of transmission and distribution (T&D) losses during the Pakistan Muslim League-N (2013-18) tenure, said Pakistan Electric Power Company (PEPCO) sources.

Transmission and distribution (T&D) losses measure power loss in the transmission of (high-voltage) electricity from power generators to distributors and in the distribution of (medium- and low-voltage) electricity from distributors to end-users.

The T&D losses are represented as a percentage of gross electricity production. They include both technical and non-technical (or commercial) losses. The later also included un-metered, unbilled, and unpaid electricity, including theft, which could be significant in developing countries.

According to the sources, the PML-N government had sold 71,055 Giga Watt Hour (GWH) units in 2013-14 with allowed T& D losses of 15.3 percent. However, the actual losses reach 18.7 percent, an increase of 3.3 percent with impact of excess losses of Rs 39,332 million and a cumulative loss impact of 39,332 million.

In the year 2014-15, the government sold 72,642 GWH units with allowed T& D losses of 14.2 percent. However, the actual losses reach 18.7 percent, an increase of 4.5 percent with impact of excess losses of Rs 52,562 million and a cumulative loss impact of 91,894 million.

In the year 2015-16, the government sold 76,623 GWH units with allowed T& D losses of 15.3 percent. However, the actual losses reach 17.9 percent, an increase of 2.6 percent with impact of excess losses of Rs 31,865 million and a cumulative loss impact of 123,759 million.

In the year 2016-17, the government sold 81,558 GWH units with allowed T& D losses of 15.3 percent. However, the actual losses reach 17.9 percent, an increase of 2.6 percent with impact of excess losses of Rs 33,961 million and a cumulative loss impact of 157,720 million.

In the year 2017-18, the government sold 91,902 GWH units with allowed T& D losses of 16.3 percent. However, the actual losses reach 18.3 percent, an increase of 2.0 percent with impact of excess losses of Rs 29,389 million and a cumulative loss impact of 187,109 million. However, the sources have pointed out that despite implying a number of policy frameworks to reduce T&D losses, Pakistan currently have 18.2% T&D losses.

In developing countries, it may be noted that the benchmark for these losses is 10%. Apart from wasting the scarce resources of energy, these losses contribute non-payment fraction of generated energy, which is compensated by the government in the form of subsidies.

Copyright Business Recorder, 2020

Comments

Comments are closed.