BR100 Increased By (0.99%)
BR30 Increased By (1.17%)
KSE100 Increased By (0.81%)
KSE30 Increased By (0.77%)
BECO 5.67 Increased By ▲ 0.08 (1.43%)
BML 65.00 Increased By ▲ 3.97 (6.5%)
BOP 33.62 Increased By ▲ 0.37 (1.11%)
CNERGY 8.21 Increased By ▲ 0.16 (1.99%)
DCL 11.35 Increased By ▲ 0.05 (0.44%)
FCCL 52.95 Increased By ▲ 0.02 (0.04%)
FCSC 5.53 Increased By ▲ 0.19 (3.56%)
FFL 17.79 Increased By ▲ 0.18 (1.02%)
FNEL 1.31 No Change ▼ 0.00 (0%)
HUMNL 11.19 Increased By ▲ 0.07 (0.63%)
KEL 7.99 Increased By ▲ 0.10 (1.27%)
KOSM 5.44 Increased By ▲ 0.11 (2.06%)
MLCF 86.00 Increased By ▲ 0.65 (0.76%)
NBP 185.98 Increased By ▲ 4.69 (2.59%)
PACE 12.05 Increased By ▲ 0.52 (4.51%)
PAEL 40.30 Increased By ▲ 0.89 (2.26%)
PIAHCLA 25.74 Increased By ▲ 0.11 (0.43%)
PIBTL 17.39 Increased By ▲ 0.24 (1.4%)
PPL 225.00 Increased By ▲ 0.18 (0.08%)
PRL 34.55 Increased By ▲ 0.37 (1.08%)
PTC 65.25 Increased By ▲ 0.17 (0.26%)
SEARL 90.52 Increased By ▲ 0.92 (1.03%)
SSGC 26.83 Increased By ▲ 0.52 (1.98%)
TELE 9.12 Increased By ▲ 0.74 (8.83%)
THCCL 69.20 Decreased By ▼ -0.14 (-0.2%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.64 Increased By ▲ 0.44 (1.82%)
TRG 71.48 Increased By ▲ 1.94 (2.79%)
WAVES 11.32 Increased By ▲ 0.29 (2.63%)
WTL 1.29 Increased By ▲ 0.02 (1.57%)

LAHORE: Pakistan had lost approximately Rs 600 billion in the form of transmission and distribution (T&D) losses during the Pakistan Muslim League-N (2013-18) tenure, said Pakistan Electric Power Company (PEPCO) sources.

Transmission and distribution (T&D) losses measure power loss in the transmission of (high-voltage) electricity from power generators to distributors and in the distribution of (medium- and low-voltage) electricity from distributors to end-users.

The T&D losses are represented as a percentage of gross electricity production. They include both technical and non-technical (or commercial) losses. The later also included un-metered, unbilled, and unpaid electricity, including theft, which could be significant in developing countries.

According to the sources, the PML-N government had sold 71,055 Giga Watt Hour (GWH) units in 2013-14 with allowed T& D losses of 15.3 percent. However, the actual losses reach 18.7 percent, an increase of 3.3 percent with impact of excess losses of Rs 39,332 million and a cumulative loss impact of 39,332 million.

In the year 2014-15, the government sold 72,642 GWH units with allowed T& D losses of 14.2 percent. However, the actual losses reach 18.7 percent, an increase of 4.5 percent with impact of excess losses of Rs 52,562 million and a cumulative loss impact of 91,894 million.

In the year 2015-16, the government sold 76,623 GWH units with allowed T& D losses of 15.3 percent. However, the actual losses reach 17.9 percent, an increase of 2.6 percent with impact of excess losses of Rs 31,865 million and a cumulative loss impact of 123,759 million.

In the year 2016-17, the government sold 81,558 GWH units with allowed T& D losses of 15.3 percent. However, the actual losses reach 17.9 percent, an increase of 2.6 percent with impact of excess losses of Rs 33,961 million and a cumulative loss impact of 157,720 million.

In the year 2017-18, the government sold 91,902 GWH units with allowed T& D losses of 16.3 percent. However, the actual losses reach 18.3 percent, an increase of 2.0 percent with impact of excess losses of Rs 29,389 million and a cumulative loss impact of 187,109 million. However, the sources have pointed out that despite implying a number of policy frameworks to reduce T&D losses, Pakistan currently have 18.2% T&D losses.

In developing countries, it may be noted that the benchmark for these losses is 10%. Apart from wasting the scarce resources of energy, these losses contribute non-payment fraction of generated energy, which is compensated by the government in the form of subsidies.

Copyright Business Recorder, 2020

Comments

Comments are closed for this article.