BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)

Minister for Communication Dr Arbab Alamgir Khan Thursday told the National Assembly that the National Highway Authority (NHA) has planned to install Electronic Toll and Traffic Management (ETTM) System on National Highways. During question-hour session of the National Assembly, he said that the system would be installed in various phases.
He said the system has already been installed on seven toll plazas, which are linked with the Operations Centre established at NHA Head Quarter to monitor traffic and toll revenue collection round-the -clock. Answering to another written reply, the minister said that a total of 46 bridges on NHA network and 793km length of roads have been damaged during flood 2010.
He said that immediate restoration works costing Rs 1340 million were carried out to open the network for traffic, adding that PC-I of Rs 23.566 billion for post-flood reconstruction /replacement projects has been recommended by CDWP for approval by ECNEC on January 21, 2011.

Copyright Business Recorder, 2011

Comments

Comments are closed for this article.