BR100 Decreased By (-0.81%)
BR30 Decreased By (-1.11%)
KSE100 Decreased By (-0.81%)
KSE30 Decreased By (-0.81%)
AGHA 7.59 Decreased By ▼ -0.10 (-1.3%)
BECO 5.51 Increased By ▲ 0.27 (5.15%)
BML 59.08 Decreased By ▼ -1.14 (-1.89%)
BOP 34.11 Decreased By ▼ -1.17 (-3.32%)
CNERGY 12.84 Decreased By ▼ -0.29 (-2.21%)
CSIL 6.10 Decreased By ▼ -0.01 (-0.16%)
FCCL 57.66 Decreased By ▼ -0.31 (-0.53%)
FFL 16.20 Decreased By ▼ -0.22 (-1.34%)
FNEL 1.21 Increased By ▲ 0.01 (0.83%)
KEL 7.48 No Change ▼ 0.00 (0%)
KOSM 5.94 Decreased By ▼ -0.10 (-1.66%)
LOTCHEM 27.99 Increased By ▲ 0.24 (0.86%)
MLCF 100.65 Decreased By ▼ -2.33 (-2.26%)
NBP 203.75 Decreased By ▼ -2.29 (-1.11%)
NCPL 60.57 Decreased By ▼ -1.67 (-2.68%)
NPL 69.96 Decreased By ▼ -1.33 (-1.87%)
OGDC 320.29 Decreased By ▼ -3.49 (-1.08%)
PACE 11.10 Decreased By ▼ -0.41 (-3.56%)
PAEL 43.12 Decreased By ▼ -0.78 (-1.78%)
PIBTL 16.56 Decreased By ▼ -0.12 (-0.72%)
PPL 228.84 Decreased By ▼ -0.63 (-0.27%)
PRL 71.02 Increased By ▲ 0.91 (1.3%)
PTC 71.65 Decreased By ▼ -0.50 (-0.69%)
SSGC 26.68 Decreased By ▼ -0.43 (-1.59%)
TBL 9.81 Decreased By ▼ -0.05 (-0.51%)
TELE 8.61 Decreased By ▼ -0.11 (-1.26%)
TPL 22.24 Decreased By ▼ -0.38 (-1.68%)
TPLP 15.11 Decreased By ▼ -0.57 (-3.64%)
TREET 24.13 Decreased By ▼ -0.08 (-0.33%)
TRG 59.84 Decreased By ▼ -1.29 (-2.11%)
Pakistan

5,789 MW power shortfall recorded

Published Updated

ElectricityISLAMABAD: The electricity shortfall in the country on Friday slightly reduced to 5,789 from 5,985 MW as the total power generation was recorded as 12,394 MW against the demand of 18,183 MW during the last 24 hours.

According to the brief on daily power generation and load-management position, the hydel generation stood at 5,008 MW,WAPDA thermal 1,546 MW, IPPs 5,743 MW and Rental 97 MW, the report said.

As many as 680 MW was supplied to Karachi Electric Supply Company (KESC).

The power demand also swelled due to rising of mercury level in the country and it stood at 18,183 MW.

Meanwhile, Islamabad Electric Supply Company (IESCO) has also increased load-shedding duration. Around six to eight hours unscheduled load-management was being carried out in twin cities of Islamabad and Rawalpindi.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed for this article.