BR100 Increased By (0.44%)
BR30 Increased By (1.39%)
KSE100 Increased By (0.62%)
KSE30 Increased By (0.61%)
BECO 5.43 Decreased By ▼ -0.06 (-1.09%)
BML 55.69 Decreased By ▼ -1.07 (-1.89%)
BOP 35.38 Increased By ▲ 0.26 (0.74%)
CNERGY 8.20 Increased By ▲ 0.05 (0.61%)
DCL 11.55 Increased By ▲ 0.04 (0.35%)
FCCL 58.36 Increased By ▲ 1.61 (2.84%)
FCSC 5.12 Decreased By ▼ -0.03 (-0.58%)
FFL 17.84 Decreased By ▼ -0.04 (-0.22%)
FNEL 1.25 No Change ▼ 0.00 (0%)
HUMNL 11.07 Decreased By ▼ -0.05 (-0.45%)
KEL 8.75 Increased By ▲ 0.33 (3.92%)
KOSM 6.69 Increased By ▲ 0.11 (1.67%)
MLCF 107.15 Increased By ▲ 3.85 (3.73%)
NBP 201.73 Increased By ▲ 1.55 (0.77%)
PACE 11.30 Increased By ▲ 0.01 (0.09%)
PAEL 44.49 Increased By ▲ 1.02 (2.35%)
PIAHCLA 29.41 Increased By ▲ 1.92 (6.98%)
PIBTL 18.64 Increased By ▲ 0.94 (5.31%)
PPL 247.98 Increased By ▲ 3.66 (1.5%)
PRL 35.29 Decreased By ▼ -0.14 (-0.4%)
PTC 66.14 Increased By ▲ 0.79 (1.21%)
SEARL 95.49 Increased By ▲ 2.17 (2.33%)
SSGC 32.04 Decreased By ▼ -0.90 (-2.73%)
TELE 8.87 Decreased By ▼ -0.04 (-0.45%)
THCCL 66.61 Decreased By ▼ -0.11 (-0.16%)
TPLP 10.57 Decreased By ▼ -0.26 (-2.4%)
TREET 25.30 Increased By ▲ 0.18 (0.72%)
TRG 64.40 Decreased By ▼ -0.50 (-0.77%)
WAVES 10.90 Decreased By ▼ -0.03 (-0.27%)
WTL 1.26 Increased By ▲ 0.01 (0.8%)
Top News

PM inaugurates 1410MW Tarbela 4th extension hydropower project

Published March 10, 2018 Updated March 10, 2018 01:32pm

TARBELA: Prime Minister Shahid Khaqan Abbasi Saturday inaugurated 1410 MW Tarbela 4th extension hydropower project. President Azad Jammu & Kashmir Sardar Masood Khan, Governor Khyber Pakhtunkhwa Iqbal Zafar Jhagra, Minister for Water Resources Syed Javed Ali Shah, Minister of State for Information Maryum Aurangzeb and Chinese Ambassador Yao Jing accompanied the Prime Minister.

First unit of 470 MW will be commissioned today, while as two more units each with equal power generating capacity will be online before the advent of summer this year. Commissioning of Tarbela 4th Extension Hydropower Project is yet another historic milestone, achieved by the government to add 1410 MW in the national grid.

The T-4 project will play a pivotal role in balancing energy mix of the country and stabilizing prices of electricity for a long span in future with an attractive economic rate of return of more than 30pc and annual cost sale of US$: 300 million to national exchequer. Completion of this important project within time and cost always held top priority of the government.

It resounds as a real proof of the Government's commitment to provide relief to common man through provision of affordable and clean energy. It will also augment economic growth and social uplift.

Tarbela Dam is located on the Indus River about 100 km northwest of Islamabad. The T-4 project is located within premises of existing Tarbela Dam Project.

Tarbela Dam Project, completed in 1976, has provision of 5 tunnels, 4 on Left Bank and 01 on Right Bank. Tunnels 1-3 have installed capacity of 3,478 MW with average annual energy generation of 15-16 billion units. The T-4 project will generate 3.84 billion units annually, equivalent of burning of 1 million ton of furnace oil. Newly installed units of T-4 project are more efficient and it is expected to have 10 -15% more energy through these units.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.