Hydropower projects are driving Nepal's flood insurance claims, with 583 claims totaling $171 million already filed, though final assessments are still underway
The estimated cost of early recovery in the first four months to build roads, temporary shelters, provide drinking water and electricity would be around $52.6 million
Figures from both countries put the number of missing close to 3,000, with 633 bodies recovered – and reports of some dead possibly swept downstream as far away as India