BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
Opinion Print edition: 2026-11-16

Perils of Buzi Top

Published Updated

The Makran Coastal Highway, linking Gwadar, Pasni, and Ormara to Karachi, is celebrated for its breathtaking scenery. Yet, one treacherous stretch - Buzi Top - has become synonymous with danger rather than beauty.

This peril stems not from nature, but from flawed human engineering. Unlike international highways built to strict safety standards, the steep incline at Buzi Top disregards basic road engineering principles, turning a vital economic artery into a death trap.

Over the years, brake failures and heavy loads have triggered frequent tragedies here - claiming six lives in a passenger bus crash in October 2015, six members of a single family in September 2019, two lives in a date-laden truck accident in September 2023, and up to a dozen pilgrims when a bus plunged into a ravine in August 2024.

With the growing commercial importance of the Iran-Gwadar transit corridor, heavy freight traffic has surged, causing daily breakdowns and gridlocks at Buzi Top. Consequently, an eight-hour journey routinely stretches to eighteen. Lacking basic roadside amenities, this isolated mountainous pass inflicts immense hardship on patients, women, and children, leaving travellers anxious before they even begin their journey.

The authorities must recognise that Buzi Top is unsustainable for heavy transport and urgently construct an alternative alignment. Because the surrounding hills consist largely of soft mudstone rather than solid granite, cutting a safer bypass is entirely feasible. Gwadar’s economic uplift depends as much on a safe coastal highway as it does on its port.

Maria Fazal Bana (Gwadar)

Copyright Business Recorder, 2026

Comments

200 characters remaining