BR100 Increased By (0.52%)
BR30 Increased By (0.49%)
KSE100 Increased By (0.46%)
KSE30 Increased By (0.58%)
BECO 5.67 Decreased By ▼ -0.06 (-1.05%)
BML 57.03 Decreased By ▼ -0.27 (-0.47%)
BOP 36.90 Increased By ▲ 0.13 (0.35%)
CNERGY 8.32 Decreased By ▼ -0.07 (-0.83%)
DCL 11.93 Decreased By ▼ -0.11 (-0.91%)
FCCL 58.70 Increased By ▲ 0.09 (0.15%)
FCSC 5.10 Increased By ▲ 0.09 (1.8%)
FFL 18.08 Increased By ▲ 0.14 (0.78%)
FNEL 1.26 No Change ▼ 0.00 (0%)
HUMNL 11.31 Decreased By ▼ -0.11 (-0.96%)
KEL 8.26 Decreased By ▼ -0.03 (-0.36%)
KOSM 6.57 Decreased By ▼ -0.05 (-0.76%)
MLCF 107.69 Decreased By ▼ -0.60 (-0.55%)
NBP 209.48 Increased By ▲ 3.44 (1.67%)
PACE 11.20 Increased By ▲ 0.03 (0.27%)
PAEL 45.54 Increased By ▲ 0.19 (0.42%)
PIAHCLA 30.33 Decreased By ▼ -0.44 (-1.43%)
PIBTL 18.87 Decreased By ▼ -0.19 (-1%)
PPL 248.61 Increased By ▲ 2.66 (1.08%)
PRL 36.30 Increased By ▲ 0.22 (0.61%)
PTC 73.75 Increased By ▲ 1.39 (1.92%)
SEARL 96.28 Decreased By ▼ -0.39 (-0.4%)
SSGC 31.43 Decreased By ▼ -0.24 (-0.76%)
TELE 9.23 Decreased By ▼ -0.04 (-0.43%)
THCCL 68.20 Increased By ▲ 0.39 (0.58%)
TPLP 11.60 Increased By ▲ 0.37 (3.29%)
TREET 25.78 Decreased By ▼ -0.11 (-0.42%)
TRG 67.40 Decreased By ▼ -0.44 (-0.65%)
WAVES 11.24 Increased By ▲ 0.26 (2.37%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)
By

DUBAI: The UAE is to fast-track construction of a new oil pipeline bypassing the Strait of Hormuz, official media said on Friday, after the Middle East war crippled exports through the vital waterway.

The West-East Pipeline will double state oil giant ADNOC’s capacity through Fujairah port and is expected to become operational next year, the Abu Dhabi Media Office said.

Abu Dhabi Crown Prince Sheikh Khaled bin Mohamed bin Zayed Al Nahyan “directed ADNOC to accelerate delivery of the project”, the report said.

An existing, 360-kilometre (224 miles) pipeline from the Habshan oil fields to Fujairah has a capacity of 1.8 million barrels per day, according to the Port of Fujairah website.

The UAE, which made waves by quitting oil cartel OPEC at the start of this month, has plans to raise production capacity to five million barrels a day by next year.

Oil facilities in Fujairah have been repeatedly struck during the Middle East war. Three Indian nationals were wounded in the latest attack on May 4.

Comments

200 characters remaining