BR100 Increased By (0.97%)
BR30 Increased By (1.29%)
KSE100 Increased By (0.96%)
KSE30 Increased By (1.1%)
AGHA 6.46 Increased By ▲ 0.08 (1.25%)
BECO 4.35 No Change ▼ 0.00 (0%)
BML 62.30 Decreased By ▼ -0.25 (-0.4%)
BOP 31.45 Increased By ▲ 0.06 (0.19%)
CNERGY 11.86 Increased By ▲ 0.13 (1.11%)
CSIL 5.88 Decreased By ▼ -0.03 (-0.51%)
FCCL 62.30 Increased By ▲ 0.59 (0.96%)
FFL 14.95 Increased By ▲ 0.16 (1.08%)
FNEL 1.32 Increased By ▲ 0.08 (6.45%)
KEL 6.35 Increased By ▲ 0.03 (0.47%)
KOSM 5.89 Decreased By ▼ -0.01 (-0.17%)
LOTCHEM 24.93 Increased By ▲ 0.24 (0.97%)
MLCF 106.55 Increased By ▲ 2.62 (2.52%)
NBP 174.80 Increased By ▲ 1.48 (0.85%)
NCPL 52.30 Increased By ▲ 0.47 (0.91%)
NPL 54.45 Increased By ▲ 0.42 (0.78%)
OGDC 320.20 Increased By ▲ 4.33 (1.37%)
PACE 9.35 Increased By ▲ 0.09 (0.97%)
PAEL 35.96 Increased By ▲ 0.38 (1.07%)
PIBTL 13.90 Increased By ▲ 0.24 (1.76%)
PPL 229.50 Increased By ▲ 3.43 (1.52%)
PRL 81.80 Increased By ▲ 1.52 (1.89%)
PTC 47.10 Increased By ▲ 0.46 (0.99%)
SSGC 24.00 Increased By ▲ 0.18 (0.76%)
TBL 9.25 Increased By ▲ 0.01 (0.11%)
TELE 7.58 Increased By ▲ 0.03 (0.4%)
TPL 25.00 Increased By ▲ 0.46 (1.87%)
TPLP 13.09 Increased By ▲ 0.10 (0.77%)
TREET 26.07 Increased By ▲ 0.09 (0.35%)
TRG 53.90 Increased By ▲ 0.57 (1.07%)

LAHORE: A delegation from the Japan International Cooperation Agency (JICA)’s consultant, Gyros Corporation, and contractor, Tec International, visited Faisalabad International Airport (FIAP) as part of the ‘Project for Improvement of Airport Security-Phase II’.

According to the Pakistan Airports Authority on Monday, the visit focused on soil testing related to the planned up-gradation of the Baggage Handling System (BHS) to Level-3 (BHS) in the International Briefing Area. The Level-3 BHS systems are equipped with state-of-the-art CT scanners/trace detectors.

Soil testing was conducted in the presence of the relevant sectional heads of FIAP to assess requirements for the installation of the new system. The visiting team also handed over two CCTV cameras for integration and testing with the existing security surveillance infrastructure. Following the field activities, the delegation met the Chief Operating Officer/Airport Manager (COO/APM) and discussed the roadmap for the commencement of construction work. The COO/APM assured full support and highlighted important considerations, including the winter schedule during the construction phase. She directed all sectional heads to ensure smooth passenger security screening during the installation of the upgraded system.

Copyright Business Recorder, 2025

Comments

Comments are closed for this article.